Laserfiche WebLink
KAISER PERMANENTE Site Prep. #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />SECTION 08 1113 - HOLLOW METAL DOORS AND FRAMES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes: <br />1. Exterior fire rated steel vault doors and frames. <br />2. Louvers installed in hollow metal doors. <br />1.3 DEFINITIONS <br />A. Minimum Thickness: Minimum thickness of base metal without coatings according to <br />NAAMM-HMMA 803 or SDI A250.8. <br />B. Code requirement: NEC Articles 110 and 450 <br />iPEI�616161 N QIZI_VIEel z <br />A. Coordinate anchorage installation for hollow -metal frames. Furnish setting drawings, <br />templates, and directions for installing anchorages, including sleeves, concrete inserts, <br />anchor bolts, and items with integral anchors. Deliver such items to Project site in time for <br />installation. <br />B. Coordinate requirements for installation of door hardware, electrified door hardware, and <br />access control and security systems. <br />1.5 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1.6 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />1. Include construction details, material descriptions, core descriptions, fire - <br />resistance ratings, and finishes. <br />B. Sustainable Design Submittals: <br />1. Product data: for products having recycled content, provide documentation <br />indicating percentages by weight of postconsumer and preconsumer recycled <br />content. Include statement indicating cost for each product having recycled <br />content. <br />2. Product data: Indicate percentages by weight of materials that have been <br />manufactured within 500 miles of the project site. Include statement indicating <br />costs for each material manufactured within 500 miles of project site. <br />C. Shop Drawings: Include the following: <br />HOLLOW METAL DOORS AND FRAMES 081113 - 1 <br />