My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE Site Prep. #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />SECTION 08 1113 - HOLLOW METAL DOORS AND FRAMES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes: <br />1. Exterior fire rated steel vault doors and frames. <br />2. Louvers installed in hollow metal doors. <br />1.3 DEFINITIONS <br />A. Minimum Thickness: Minimum thickness of base metal without coatings according to <br />NAAMM-HMMA 803 or SDI A250.8. <br />B. Code requirement: NEC Articles 110 and 450 <br />iPEI�616161 N QIZI_VIEel z <br />A. Coordinate anchorage installation for hollow -metal frames. Furnish setting drawings, <br />templates, and directions for installing anchorages, including sleeves, concrete inserts, <br />anchor bolts, and items with integral anchors. Deliver such items to Project site in time for <br />installation. <br />B. Coordinate requirements for installation of door hardware, electrified door hardware, and <br />access control and security systems. <br />1.5 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1.6 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />1. Include construction details, material descriptions, core descriptions, fire - <br />resistance ratings, and finishes. <br />B. Sustainable Design Submittals: <br />1. Product data: for products having recycled content, provide documentation <br />indicating percentages by weight of postconsumer and preconsumer recycled <br />content. Include statement indicating cost for each product having recycled <br />content. <br />2. Product data: Indicate percentages by weight of materials that have been <br />manufactured within 500 miles of the project site. Include statement indicating <br />costs for each material manufactured within 500 miles of project site. <br />C. Shop Drawings: Include the following: <br />HOLLOW METAL DOORS AND FRAMES 081113 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.