Laserfiche WebLink
KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />Site Prep. #1 Electrical Service <br />March 18, 2020 <br />Proiect No. 19.05002.00 <br />2. Fire -Rated Doors: Install doors with clearances according to NFPA 80. <br />3. Smoke -Control Doors: Install doors according to NFPA 105. <br />D. Glazing: Comply with installation requirements in Section 08 80 00 "Glazing" and with <br />hollow -metal manufacturer's written instructions. <br />3.3 CLEANING AND TOUCHUP <br />A. Prime -Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas <br />of prime coat and apply touchup of compatible air -drying, rust -inhibitive primer. <br />B. Metallic -Coated Surface Touchup: Clean abraded areas and repair with galvanizing <br />repair paint according to manufacturer's written instructions. <br />END OF SECTION 08 11 13 <br />HOLLOW METAL DOORS AND FRAMES 081113 - 7 <br />