KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />Site Pre. #1 Electrical Service <br />March 18, 2020 <br />Project No. 19.05002.00 <br />D. Thresholds: Set thresholds for exterior and acoustical doors in full bed of sealant <br />complying with requirements specified in Division 7 Section "Joint Sealants." <br />E. Storage: Provide a secure lock up for hardware delivered to the project but not yet <br />installed. Control the handling and installation of hardware items so that the completion <br />of the work will not be delayed by hardware losses before and after installation. <br />3.4 FIELD QUALITY CONTROL <br />A. Field Inspection: Supplier will perform a final inspection of installed door hardware and <br />state in report whether work complies with or deviates from requirements, including <br />whether door hardware is properly installed, operating and adjusted. <br />3.5 ADJUSTING <br />A. Initial Adjustment: Adjust and check each operating item of door hardware and each door <br />to ensure proper operation or function of every unit. Replace units that cannot be <br />adjusted to operate as intended. Adjust door control devices to compensate for final <br />operation of heating and ventilating equipment and to comply with referenced <br />accessibility requirements. <br />3.6 CLEANING AND PROTECTION <br />A. Protect all hardware stored on construction site in a covered and dry place. Protect <br />exposed hardware installed on doors during the construction phase. Install any and all <br />hardware at the latest possible time frame. <br />B. Clean adjacent surfaces soiled by door hardware installation. <br />C. Clean operating items as necessary to restore proper finish. Provide final protection and <br />maintain conditions that ensure door hardware is without damage or deterioration at time <br />of owner occupancy. <br />3.7 DEMONSTRATION <br />A. Instruct Owner's maintenance personnel to adjust, operate, and maintain mechanical <br />and electromechanical door hardware. <br />3.8 DOOR HARDWARE SETS <br />A. The hardware sets represent the design intent and direction of the owner and architect. <br />They are a guideline only and should not be considered a detailed hardware schedule. <br />Discrepancies, conflicting hardware and missing items should be brought to the attention <br />of the architect with corrections made prior to the bidding process. Omitted items not <br />included in a hardware set should be scheduled with the appropriate additional hardware <br />required for proper application and functionality. <br />B. Manufacturer's Abbreviations: <br />DOOR HARDWARE 087100 - 18 <br />