Laserfiche WebLink
KAISER PERMANENTE Site Prep #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />TABLE OF CONTENTS <br />DIVISION 21 - FIRE SUPPRESSION <br />SECTION 21 10 00 - WATER -BASED FIRE SUPPRESSION SYSTEMS <br />DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING <br />SECTION 23 05 00 — COMMON MECHANICAL MATERIALS AND METHODS <br />SECTION 23 05 48 - VIBRATION AND SEISMIC CONTROLS FOR MECHANICAL PIPING AND <br />EQUIPMENT <br />SECTION 23 05 53 — IDENTIFICATION FOR MECHANICAL PIPING AND EQUIPMENT <br />SECTION 23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR MECHANICAL <br />SECTION 23 09 00 - INSTRUMENTATION AND CONTROLS FOR HVAC <br />SECTION 23 31 13 - METAL DUCTS <br />SECTION 23 33 00 — AIR DUCT ACCESSORIES <br />SECTION 23 34 00 — FANS <br />DIVISION 26 - ELECTRICAL <br />SECTION 26 01 00 - BASIC ELECTRICAL REQUIREMENTS <br />SECTION 26 05 19 - LOW -VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES <br />SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS <br />SECTION 26 05 29 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS <br />SECTION 26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS <br />SECTION 26 05 44 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING <br />SECTION 26 05 48.16 - SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS <br />SECTION 26 05 53 - IDENTIFICATION FOR ELECTRICAL SYSTEMS <br />SECTION 26 05 72 - OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY <br />SECTION 26 05 73 - OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY <br />SECTION 26 05 74 - OVERCURRENT PROTECTIVE DEVICE ARC -FLASH STUDY <br />SECTION 26 24 16 - PANELBOARDS <br />SECTION 26 27 26 - WIRING DEVICES <br />SECTION 26 28 16 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS <br />SECTION 26 29 13.03 - MANUAL AND MAGNETIC MOTOR CONTROLLERS <br />SECTION 26 50 00 - GENERAL LIGHTING PROVISIONS <br />SECTION 26 51 00 - INTERIOR LIGHTING SYSTEMS <br />END OF TABLE OF CONTENTS <br />TABLE OF CONTENTS <br />