My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE Geotech Report 2025-03-07
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
Geotech Report
>
2930 MAPLE ST KAISER PERMANENTE Geotech Report 2025-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2025 3:41:52 PM
Creation date
3/7/2025 3:39:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report-Revised lrerracon <br /> Kaiser Everett Medical Center Everett,Washington -- s--- y� <br /> December 18, 2019 Terracon Project No. 81195071 GeORepOrt <br /> Install joint sealant and seal cracks immediately. <br /> Seal all landscaped areas in or adjacent to pavements to reduce moisture migration to <br /> subgrade soils. <br /> ■ Place compacted, low permeability backfill against the exterior side of curb and gutter. <br /> GENERAL COMMENTS <br /> Our analysis and opinions are based upon our understanding of the project, the geotechnical <br /> conditions in the area, and the data obtained from our site exploration. Natural variations will occur <br /> between exploration point locations or due to the modifying effects of construction or weather. <br /> The nature and extent of such variations may not become evident until during or after construction. <br /> Terracon should be retained as the Geotechnical Engineer, where noted in this report, to provide <br /> observation and testing services during pertinent construction phases. If variations appear, we <br /> can provide further evaluation and supplemental recommendations. If variations are noted in the <br /> absence of our observation and testing services on-site, we should be immediately notified so <br /> that we can provide evaluation and supplemental recommendations. <br /> Our Scope of Services does not include either specifically or by implication any environmental or <br /> biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of <br /> pollutants, hazardous materials or conditions. If the owner is concerned about the potential for <br /> such contamination or pollution, other studies should be undertaken. <br /> Our services and any correspondence or collaboration through this system are intended for the <br /> sole benefit and exclusive use of our client for specific application to the project discussed and <br /> are accomplished in accordance with generally accepted geotechnical engineering practices with <br /> no third-party beneficiaries intended. Any third-party access to services or correspondence is <br /> solely for information purposes to support the services provided by Terracon to our client. <br /> Reliance upon the services and any work product is limited to our client, and is not intended for <br /> third parties. Any use or reliance of the provided information by third parties is done solely at their <br /> own risk. No warranties, either express or implied, are intended or made. <br /> Site characteristics as provided are for design purposes and not to estimate excavation cost. Any <br /> use of our report in that regard is done at the sole risk of the excavating cost estimator as there <br /> may be variations on the site that are not apparent in the data that could significantly impact <br /> excavation cost. Any parties charged with estimating excavation costs should seek their own site <br /> characterization for specific purposes to obtain the specific level of detail necessary for costing. <br /> Site safety, and cost estimating including, excavation support, and dewatering <br /> requirements/design are the responsibility of others. If changes in the nature, design, or location <br /> of the project are planned, our conclusions and recommendations shall not be considered valid <br /> unless we review the changes and either verify or modify our conclusions in writing. <br /> Responsive ■ Resourceful ■ Reliable 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.