Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 7/2/2024 7/2/2024 BLDG 12- Matt Schreifels APPROVAL eTRAKiT Inspection Request <br /> INSULATION <br /> Notes: <br /> 6/26/2024 2:29 PM INTEGRITY MAINT&RPR LLC <br /> Contact Name:INTEGRITY MAINT&RPR LLC <br /> Site Address:2402 MELVIN AVE UNIT A <br /> Phone:4252326650 <br /> e-Mail:jeremy@integrityrepair.net <br /> 7/11/2024 7/11/2024 BLDG 10-DRYWALL Matt Schreifels APPROVAL eTRAKiT Inspection Request <br /> NAILING <br /> Notes: <br /> 7/8/2024 3:19 PM INTEGRITY MAINT&RPR LLC <br /> Contact Name:INTEGRITY MAINT&RPR LLC <br /> Site Address:2402 MELVIN AVE UNIT A <br /> Phone:4252326650 <br /> e-Mail:jeremy@integrityrepair.net <br /> 9/11/2024 9/11/2024 BLDG 16-FINAL Matt Schreifels CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 9/4/2024 3:16 PM INTEGRITY MAINT&RPR LLC <br /> Contact Name:INTEGRITY MAINT&RPR LLC <br /> Site Address:2402 MELVIN AVE UNIT A <br /> Phone:4252326650 <br /> e-Mail:jeremy@integrityrepair.net <br /> 1.)install interior doors with A.F.H.Required hardware.2.)replace entry door hardware with A.F.H required hardware.3.)install drywall in mechanical <br /> closet4.)replace window adjacent to entry door with tempered safety glazing per 2018 IRC Section R308 Glazing5.)replace/revise ramp to comply with <br /> city&state requirements and building codes(2018 IRC Section R330.9 Ramps)This list may not encompass all corrections items required to pass final <br /> inspection and/or sign off of A.F.H.paperwork.Verify that all items listed and unlisted in this correction notice have been addressed prior to scheduling <br /> for A.F.H.Final inspection. <br /> 10/23/2024 10/23/2024 BLDG 16-FINAL Matt Schreifels CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 10/23/2024 4:49 AM INTEGRITY MAINT&RPR LLC <br /> Contact Name:INTEGRITY MAINT&RPR LLC <br /> Site Address:2402 MELVIN AVE UNIT A <br /> Phone:4252326650 <br /> e-Mail:jeremy@integrityrepair.net <br /> Handrails required on both sides of ramp and main egress door hardware required to unlock when opening from inside to ensure patients are not able <br /> to be locked out.once items have been addressed reschedule for final adult family home inspection <br /> I <br /> Printed:Thursday, 12 December,2024 2 of 3 rk <br /> SUPERION <br />