My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5316 ROCKEFELLER AVE 2025-03-10
>
Address Records
>
ROCKEFELLER AVE
>
5316
>
5316 ROCKEFELLER AVE 2025-03-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:38:17 PM
Creation date
3/10/2025 1:35:51 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
5316
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Describe drainage flow paths (direction, location): <br /> Drainage flow paths down slope to the north. <br /> Are there Critical Areas?What are they and where are they located relative to your project? <br /> (Check with the Planning Division at planning(ci everettwa.gov if you are unsure if the property is in <br /> close proximity to a Critical Area.): <br /> No. <br /> Task 2: Describe proposed project <br /> Describe your proposed project: <br /> Conditioned addition to a single family residence. Roof added over walkway to <br /> create a covered approach to the main entrance. <br /> How will your project change the existing condition?: <br /> The footprint of the existing house will expand to the north. Remove portions of <br /> the existing paved patio (225 SF). <br /> Describe roofs, patios, driveways, or structures added: <br /> Drives and existing garage will remain as is. Roof for the addition will tie in to <br /> the existing roof at the roof level. Covered walkway roof will shed water to the <br /> north. <br /> How will stormwater be managed in the final condition?: <br /> New conditioned area roof will tie into existing downspouts at the northeast and <br /> northwest corners of the existing residence. Water collected from the low roof <br /> over the entrance will discharge via a single splash block. <br /> Describe how the project will affect existing drainage systems onsite or on adjacent properties <br /> or both: <br /> Additional water collected will be discharged/infiltrated on site per plans. <br /> Minimal to no net effect on systems and adjacent neighbor's properties. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.