My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5316 ROCKEFELLER AVE 2025-03-10
>
Address Records
>
ROCKEFELLER AVE
>
5316
>
5316 ROCKEFELLER AVE 2025-03-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:38:17 PM
Creation date
3/10/2025 1:35:51 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
5316
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 5. Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters.A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performing the work at <br /> the jobsite for reference and updating during the duration of construction. <br /> 0 Task 1: Describe the project during construction <br /> (You may attach a narrative that answers the following questions) <br /> Nature and purpose of the construction project: <br /> Addition to the north side of an existing single-family residence. <br /> Adjacent areas, including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> Site will be accessed via existing driveway off road to the east. Traffic increase <br /> for a project of this size will be minimal. Construction will occur during normal <br /> business hours. There are no adjacent streams/wetlands. <br /> How upstream drainage areas may affect the site: <br /> Will not affect the site. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> Will have no affect on downstream drainage. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> No. <br /> Special requirements and provisions for working near or within critical areas: <br /> None required. Area of work will be receive a perimeter silt fence. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 9 <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.