Laserfiche WebLink
Element 3. Control flow rates: <br /> ❑ BMP C203:Water Bars <br /> • BMP C240:Sediment Trap <br /> ❑ BMP C24I:Temporary Sediment Pond <br /> El Other Per the SWMMWW: <br /> El Not applicable to my proposed project <br /> Explain: <br /> Element 4. Install sediment controls: <br /> ❑ BMP C23 I:Brush Barrier <br /> ❑ BMP C232:Gravel Filter Berm <br /> ® BMP C233:Silt Fence <br /> El BMP C234:Vegetated Strip <br /> El BMP C235:Wattles <br /> El BMP C240:Sediment Trap <br /> El BMP C241:Temporary Sediment Pond <br /> ❑ Other Per the SWMMWW: <br /> El Not applicable to my proposed project <br /> Explain: <br /> Element 5. Stabilize soils: <br /> ® BMP C 120:Temporary and Permanent Seeding <br /> ® BMP C 121:Mulching <br /> El BMP C 122: Nets and Blankets <br /> El BMP C 1 23:Plastic Covering <br /> El BMP C124:Sodding <br /> El BMP C125:Topsoiling/Composting <br /> ❑ BMP C 126:Polyacrylamide for Soil Erosion Protection <br /> ❑ BMP C 130:Surface Roughening <br /> ❑ BMP C 131:Gradient Terraces <br /> ❑ OtherPertheSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 11 <br /> the Combined Sewer Area-April 2021 <br />