My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5316 ROCKEFELLER AVE 2025-03-10
>
Address Records
>
ROCKEFELLER AVE
>
5316
>
5316 ROCKEFELLER AVE 2025-03-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:38:17 PM
Creation date
3/10/2025 1:35:51 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
5316
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHITECTURE STUDIO OF EVERETT <br /> 615 35TH STREET - EVERETT WA 99201 <br /> 206 931 0990 GARIH®ARCHSTUDIOEVERETT.0011 \,EVEA[1T <br /> October 21,2021 D 1E©I 'll yEti <br /> Subject: Response to BuildingPermit Review Letter <br /> p OCT 2 <br /> 2 2021 <br /> Project Name: Hults Addition CITY Or EVERET Plan Check#: B2108-033 Permit S T <br /> Site Address: 5316 Rockefeller Avenue Services <br /> Drew, <br /> Please see the response below to your questions/comments issued in the Building Permit Review Letter dated August <br /> 24, 2021. <br /> 1. The existing house appears to have significant unpermitted work, including but not limited to the conversion of <br /> the original garage to living space. The construction drawings should be revised to show the converted <br /> garage as part of the current permit application. <br /> Yes, the existing residence contains unpermitted work. The drawings have been revised to show the <br /> conversion of the attached garage into conditioned living space. The drawings have been revised to reflect <br /> this. <br /> 2. The total area of the proposed work includes creating more than 500 SF of new conditioned space. Additional <br /> energy credits are required per WSEC Section R406. <br /> The proposed work create 1,126 square feet of new conditioned floor area, and therefore requires 3 energy <br /> credits. This was shown on the original permit set/application and remains true. <br /> 3. The construction drawings may be incomplete. For example,detail 1/A4.1 specifies anchor bolts per shear <br /> wall schedule, which does not appear to be included in the drawings. The drawings should be revised as <br /> needed. <br /> The drawing set wasn't missing this information. It was found under the structural notes on sheet A0.0. <br /> Sheets A2.0 and A2.1 now provide more shearwall information at the bottom of each sheet. <br /> 4. Additional typical structural framing details should be included in the construction drawings, including but not <br /> limited to: <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.