Laserfiche WebLink
2022 System Development Fee Calculations <br /> Permit#: B2307-028 Additional Notes: <br /> Project Address: 535 VIEW RIDGE DR <br /> Project Name: NEW SFR AND SITE WORK <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: _Everett Prepared By: THAD NEWPORT Date: 7/14/2023 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: e y 7�jt,�p t_, Date: I .- lit 2 3 <br /> Fee Calculations: < �j <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *subject to Administrative Guidelines Proposed Building Use: SFR/Townhome Previous Bldg Use#1: SFR/Townhome Previous Bldg Use#2: No Other Use Previous Bldg Use#3: No Other Use <br /> ProposedUnit Measure: 1 Unit Unit Measure for Use#1: 1 Unit Unit Measure for Use#2: - None Unit Measure for Use#3: - None <br /> Note:Meter Size Used for Proposed Meter Size: 1"dom/fire Credited Meter#1 Size: 3/4" Credited Meter#2 Size: None Credited Meter#3 Size: None <br /> Calculation Water Fee: $4,311.00 Water Credit#1: $4,311.00 Water Credit#2: $0.00 Water Credit#3: $0.00 <br /> Sewer Fee: $5,580.00 Sewer Credit#1: $5,580.00 Sewer Credit#2: $0.00 Sewer Credit#3: $0.00 <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit#:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> Sewer Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> Total: $0.00 <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: None Credited Meter Size: None <br /> Water Fee: $0.00 Water Credit: $0.00 <br /> No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Permit#:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee: $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> Total: $0.00 <br /> Fire Meter: Proposed Meter Size: None For informational purposes only <br /> Permit#:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> Permit#: B2307-028 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 3,267 SF <br /> Stormwater System Dev Fee: $874.90 Add this fee to the Building Permit <br /> Permit#: PW2307-003 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 3,137 SF <br /> Stormwater System Dev Fee: $840.09 Add this fee to the Public Works Permit <br />