Laserfiche WebLink
ro - 4k-sciLP <br /> Call regarding drywall only permit. Contractor stated only replacing drywall due to flood in basement. <br /> Replacement of insulation and some rotted studs.Approved for building permit(drywall only). <br /> 6/10/2022: Plumbing, mechanical and drywall permit issued. <br /> 7/18/2022: Plumbing inspection:Jason <br /> Violation: Drywall only permit is insufficient for framing work that has been done at this address. <br /> A building permit will need to be pulled which will also require plan review!! <br /> 8/9/2022: Building Consult inspection on drywall permit: Rakeeb Khan with Ryan <br /> Violation: Building permit required for new floor beam. Requires engineer approval or replace <br /> with code compliant beam per the irc. Discussed potential conversion of adu. Bedroom requires <br /> emergency egress opening. Will email owner and contractor additional information. <br /> 10/05/2022: <br /> Site visit with Steve Banks. Explained to contractor and homeowner that any un permitted work <br /> above the basement will need to be exposed for visual inspection to ensure all work is code <br /> compliant for building, plumbing, mechanical and electrical.Also informed contractor and <br /> owner that a proposed set of building plans will need to be approved by the city before work <br /> can be performed. <br /> B2302-011: <br /> -Applied on 02/06/2023 <br /> -Incomplete application 2/7/2023:Audrey sent email.Tried applying online for a building <br /> permit. <br /> -Follow up on 3/9/2023 <br /> -Plans sent for review on 4/10/203. Planning corrections on 4/11/2023. Planning approved <br /> 5/12/2023 <br /> -Plans approved 6/23/2023 <br /> � 3 <br />