My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1420 80TH ST SW D BIRDWELL MACHINE 2025-03-11
>
Address Records
>
80TH ST SW
>
1420
>
BIRDWELL MACHINE
>
1420 80TH ST SW D BIRDWELL MACHINE 2025-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2025 9:36:03 AM
Creation date
3/11/2025 9:34:27 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1420
Unit
D
Tenant Name
BIRDWELL MACHINE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.c <br /> N <br /> 2-2.Selection of copper and heat insulation materials <br /> When using commercial copper pipes and fittings,observe the following: Gas pipe Inter-unit wire <br /> • Insulation material: Polyethylene foam Liquid pipe <br /> Heat transfer rate: 0.041 to 0.052W/mK(0.024 to 0.030Btu/fth°F(0.035 to <br /> 0.045kca1/mh°C)) O D <br /> Be sure to use insulation that is designed for use with HVAC Systems. <br /> • ACR Copper only. Gas pipe Liquid pipe <br /> insulation insulation <br /> Finishing tape Drain hose <br /> • Be sure to insulate both the gas and liquid piping and observe the insulation <br /> dimensions as below. <br /> Piping size Minimum bend radius Piping thickness Thermal insulation size Thermal insulation <br /> thickness <br /> O.D.3/8 inch 1-3/16 inch(30mm) I.D.15/32-19/32 inch <br /> (9.5mm) or more 0.031 inch(0.8mm) (12-15mm) <br /> O.D.1/2 inch 1-9/16 inch(40mm) (C1220T-O) I.D.9/16-5/8 inch <br /> Gas side <br /> (12.7mm) or more (14-16mm <br /> ) 13/32 inch <br /> O.D.5/8 inch 1-15/16 inch(50mm) 0.039 inch(1.0mm) I.D.5/8-13/16 inch (10mm)Min. <br /> (15.9mm) or more (C1220T-O) (16-20mm) <br /> Liquid side O.D.1/4 inch 1-3/16 inch(30mm) 0.031 inch(0.8mm) I.D.5/16-13/32 inch <br /> (6.4mm) or more (C1220T-O) (8-10mm) <br /> • Use separate thermal insulation pipes for gas and liquid refrigerant pipes. <br /> Installation Tips <br /> 1 . Removing and installing the front panel <br /> • Removal method <br /> 1 Placeyour fingers in the indentations on the main unit(one each on Indentations on <br /> g the main unit <br /> the left and right sides), and open the front panel until it stops. —ram <br /> • fI tj\\40,.. <br /> at <br /> 2) While pushing the left side front panel shaft outward, push up the Front panel shaft <br /> front panel and remove it.(Remove the right side front panel shaft in <br /> the same manner.) <br /> 3)After removing both front panel shafts, pull the front panel toward <br /> yourself and remove it. 1 <br /> 7/111— <br /> ill ia�r <br /> • Installation method <br /> Align the shaft of the front panel with the grooves of grill, and push <br /> all the way in, then close slowly.Push the center of the lower panel <br /> surface firmly to engage the hooks. <br /> •English ///` 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.