My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1817 HOYT AVE 2025-04-15
>
Address Records
>
HOYT AVE
>
1817
>
1817 HOYT AVE 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:39:51 PM
Creation date
3/11/2025 10:54:40 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1817
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 of 30 <br /> PROJECT NO. SHEET NO. <br /> �.�� S210803-1XR <br /> / <br /> �l•' PROJECT 1817 HOYT AVE EVERETT WA 98201 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN BY NJ DATE 9/26/21 <br /> LOAD ANALYSIS:IBC 2018-1 STORY \ / <br /> BUILDING V <br /> Typical Pile 6'-0"(14&17) Span: /1/ L/2 U2 <br /> Roof LL(snow ground):25 psf <br /> Floor LL:40psf <br /> Floor/Roof DL: 15psf <br /> Wall DL:12psf <br /> Stemwall DL: 100 psf(8"wall) . <br /> Roof Trib: 0.5*30'span=15' <br /> 1st Floor Trib:0.5*14'max span=7' <br /> Typical Fir Ht: 10'*1 story=10'-0" <br /> Case 2:Uniform Load: <br /> WDL=15psf*(15'+7')+12psf*(10')=.45k1f 2'-2" <br /> WDL(slemwall)=100psf*2.5ft=.25k1f (18"+ 8") <br /> WsL=25psf*(15')=0.375 klf <br /> WLL=40psf*(10'+7')=0.68 klf <br /> Wm=DL+SL+LL= <br /> 0.45k1f+0.375k1f+0.68k1f=1.5 klf(w/o <br /> stemwall) Pile and connection requirements per Pile and connection requirements per <br /> 0.45k1f+0.375k1f+0.25k1f+0.68k1f=1.75k1f contractor contractor <br /> (w/stemwalll <br /> Case 1:Point Load(6'-0"span): <br /> 6'-0" max <br /> PDL=0.45k1f*6'-0"=2.7 kips <br /> PDL(stemwall)=0.25klf*6'-0"=1.5 kips <br /> Pa.=0.375k1f*6'-0"=2.25 kips <br /> PLL=0.68klf*6'-0"=4.1 kips NOTES: <br /> 1. Both uniform and point loads analyzed in the following calculations.Uniform loads are <br /> PTL(w/o stemwall DL)=1.5k1f*6'-0"=9k assumed to be standard due to load distribution from bearing walls,however,the additional <br /> PTL(w/o stemwall and w/chimneyload)=9k+7k= point load is conservatively considered here for any major beam supports from above. <br /> 16 kips <br /> PTL(w/stemwail DL)=1.75*6'-0"=10.5k 2. Maximum loading on the grade beam was determined by inspection of the building <br /> PTL(w/stemwatl and w/chimnoy load)=10.5k+7k= geometry and through conservative assumptions regarding span lengths and support <br /> 17.5kips wall/foundation. All concrete walls assumed full tributary span of floor and roof members. <br /> Refer to attached calculations for <br /> analysis. <br /> Conclusion: <br /> Based on the loading and geometry of the structure we conclude that the foundation <br /> may be stabilized through the use of piles and connections per R&R. These are to be <br /> attached to the stem-wall(grade-beam)at an on-center(o.c.)spacing no greater than <br /> 6'-0". <br /> L120 ENGINEERING&DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.