Laserfiche WebLink
HOLDOWN SCHEDULE <br /> *FOR HOLDOWNS INSTALLED IN NEW FOUNDATIONS DOUBLE STUD <br /> OR PER PLAN <br /> MODEL ANCHOR THRU BOLTS OR EMBEDMENT/ MINIMUM de F STRAP PER PLAN - _ <br /> BOLT NAILS/SCREWS STRAP LENGTH EDGE DIST. CENTER BETWEEN <br /> FLOORS. 4 <br /> LSTHD8/RJ NA (24) 10d COMMON 8" EMBED 1Yz' NA NA .i y' POST PER HOLDOWN PER PLAN % C 7 N E <br /> STH D10/RJ NA (28) 16d COMMON 10" EMBED 1Y2" NA NA PLAN/SGH EDU LE <br /> STHD14/RJ NA (38) 16d COMMON 14" EMBED 1Y2" NA NAq (2-2x MIN) ALL-THREAD ROD, CLEAR SPAN . <br /> ai DIAMETER AND <br /> HDU5-SDS2.5 PABS (14) }x2 SOS IN SEE 'de' & 'F' 1 6�" 10" 42 DIA. NO NAILS <br /> DOUBLE STUD 42 DIA. EMBEDMENT PER REQUIRED <br /> HDU8-SDS2.5 PAB7 (20) }x2P SIDS OST IN 4x6 SEE 'de' & 'F' 1J" 9" 131'• jj ',�i° 2'-0" MIN SCHEDULE <br /> (30) 10d COMMON IN CENTER ON RIM - ;, 'i;'. . °' . ° . PRESSURE TREATED <br /> CS14 N/A 3a' + CLEAR SPAN NA NA ° .°, ' �..9 _ _______--_a_ '� <, a SILL PLATEPER "'•SINGLE STUD JOIST -_-a`-_ __' __.______--_s___�_-__•__ xra.-�_� J,_y, — <br /> i'A <br /> it <br /> -y e.-a.. EMBEDMENT a SHEARWALLr.:;",, <br /> HOEDOWN NOTES LENGTH s: ;? FLOOR FRAMING U <br /> CORNER SCHEDULE 30" min. ONE #4 REBAR PER PLAN O <br /> 1. ALL-THREAD BOLTS SHALL CONFORM TO ASTM A307. BAR SAME REBAR IN SHEAR CONE DOUBLE STUD CO <br /> 42 DIA. SIZE & °, STEM WALL PER LENGTH (12" MIN. REBAR <br /> 2. MINIMUM CONCRETE COMPRESSIVE STRENGTH f-2500 PSI. 2'-0" MIN DIA. . SPACING AS '- LENGTH) OR PER PLAN LLJ—0 <br /> MINIMUM WALL THICKNESS IS 8". °' L42 <br /> MAIN. 2'-0" MIN. ALTERNATE BAR HORIZ. WALL FOUNDATION 1/2" MIN. / Q �O N 0 <br /> VARIES DIRECTION REINF. SCHEDULE FROM CORNER Q N CD U <br /> 3. ALL HOLDOWNS REQUIRE A (2) 2x POST UNLESS NOTED ° 10� <br /> OTHERWISE. WHERE HOEDOWNS ARE INSTALLED INTO THE WIDE ANCHOR CORNER REINFORCEMENT DETAILS 'HDU' INSTALLATION 'STHD' INSTALLATION FLOOR TO FLOOR Q <br /> FACE OF THE STUD, THE STUDS MUST BE STITCH NAILED SCHEDULE `� <br /> TOGETHER W/16d SINKERS STAGGERED @ 4" O/C. a 1 STRAP (n (,2'N N <br /> 4. MINIMUM EDGE DISTANCE IS FOR FORMED CONCRETE dO .. a, .°9 Q) �+: C3 <br /> EXPOSED TO WEATHER OR SOIL. FOR CONCRETE CAST " N <br /> AGAINST SOIL PROVIDE 3" CLEAR TO ANCHOR BOLT. A F CD LJ <br /> o z 3 <br /> 5. NAILS/SCREWS TO HOLDOWN POST SHALL BE PER O0 W 0 3 <br /> MANUFACTURER'S SPECIFICATIONS. 2F (MIN) <br /> C <br /> 6. WHEN FIELD CONDITION BECOME LESS THAN MINIMUM FOR "FT'G" HOLDOWNS <br /> SHOWN, CONTACT ENGINEER PRIOR TO PROCEEDING. ONLY D K <br /> r J U <br /> 7. ALL HOLDOWN BOLTS MUST BE RE-TIGHTENED JUST PRIOR FT'V` HOEDOWN B <br /> TO ENCLOSING SECOND SIDE OF WALL. <br /> C O N N. 12" -4 <br /> I Ln <br /> I <br /> I <br /> q 0 <br /> WALL PER PLA i � Z <br /> (2) LAYERS OF 90# o <br /> FELT OR EQUIVALENT <br /> [ N M O <br /> SILL PLATE AND ANCHOR BOLTS G U1 > > > > > <br /> PER SHEARWALL SCHEDULE. (USE WALL PER PLAN COLUMN PER PLAN H E > (n <br /> SLAB PER PLAN W <br /> 2x6 P.T. SILL PLATE W/%" 001 <br /> J-BOLTS®48" O/C MIN.) SILL PLATE AND ANCHOR BOLTS O :•"'" ? oc <br /> BACKFILL W/POROUS PER SHEARWALL SCHEDULE. (USE (2) LAYERS OF 90# <br /> 2x6 P.T. SILL PLATE W/ 0 FELT OR EQUIVALENT 0] N N n n n n <br /> MATERIAL (TYP) 5/ ': +• <br /> J-BOLTS ®48" O/C MIN. is BASE PLATE N N N N <br /> :a°. .' s�....:� 3• a ....4..�- �L .:' .. W O M O <br /> 6 d ° a ° LAB PER PLAN 1 _ DOUBLE PLATE EDGE NAILING <br /> 6„ F c 3000P51 (MIN)NON SHRINK GROUT ~ <br /> -� ICI — ° � �- ° = MIN ®(STAGGER)P W/ O AND PL,ANP HD SCHEDULE 0 0 0 0 0 0 0 <br /> _III—III- BASE PL 3a" x 12" x 12" w/ ( QS-SD53 N a <br /> '^ 4 PAB4 Y2"0 OR ©SHEARWALL EDGE NAILING AT ALL PANE SHOWN <br /> iil=lil—I — = FOOTING PER PLAN <br /> EQUIVALENT, EMBED 12" EDGES. BLOCKING AT ALL PANEL EDGES` (0)COORDINATE ALL STUD �Z <br /> _ _ _ N <br /> 8" WALL w/#4 BARS 0 18' -III III -- WHERE APPLICABLE. <br /> FROST DEPTH FROST DEPTH II-IIL III-III- 6" WALL w/#4 BARS ®18" AND PLATE slzEs w/ <br /> o/c EACH WAY. OK #4 o/c EACH WAY. (2) #4 ©EDGE NAILING TO HOEDOWN POST(FULL SHEARWALL SCHEDULE <br /> (18" MIN) BARS TOP. HOOK (18" MIN) BARS @ TOP. HOOK HEIGHT) STAGGER INTO DOUBLE STUDS REQUIREMENTS <br /> VERTICAL BARS INTO FOOTING VERTICAL BARS INTO FOOTING <br /> ALTERNATE HOOK PER STUDS ®16" ON CENTER Q)EDGE NAILING TO POSTS, <br /> DIRECTION. PLAN - ALTERNATE HOOK E PRESSURE TREATED SILL PLATE WITH TRIM STUDS, AND KING <br /> P DIRECTION. <br /> I EDGE NAILING AND ANCHOR BOLTS PER STUDS <br /> 4" 0 PERFORATED PLASTIC PIPE. 1_16" (2) #4 (TYP) PER PER PLAN �3 SHEARWALL SCHEDULE. (K BEARING STUD FOR <br /> CENTER IN ONE CUBIC FOOT OF PLAN <br /> FREE DRAINING GRAVEL AND DRAIN ATOP PLATE SPLICE NAILING TO BE (8) 16d HEADER z <br /> TO APPROVED OUTFALL. SINKERS (MIN). LAP 48"STUD. <br /> MINIMUM. <br /> CENTER SPLICE ON STUD. 0 W —0 <br /> �� F /SHEARWALL CONN. �F /SHEARWALL CONN. COLUMN & FOOTING CONN. 8 �T�O SHEARWALL ELEVATION ; Q 00 <br /> w IQ <br /> Q <br /> m 3 W <br /> L L-1 0 � <br /> ° 2x6 DOUBLE � W <br /> TOP PLAT p K (8) 10d NAILS <br /> ON EA. SIDE O <br /> J <br /> B NOTE:THE LTP4 AND THE 3x BOTTOM PLATE MAY BE ELIMINATED FOR THE SHEAR CONNECTION <br /> 48 FOR SHEARWALL #'S 1-5 IF THE SHEATHING FROM THE SHEARWALL IS BROKEN ONLY AT THE <br /> CENTER OF THE RIMJOIST AND NAILED TO THE RIMJOIST w/ (2) ROWS OF PANEL EDGE NAILING. <br /> \ BREAK SHEATHING ON PLATE AS BREAK SHEATHING ON PLATE AS COVI <br /> G �n1 TOP SILL PLATE SPLICE SHOWN. SEE NOTE FOR ALTERNATE SHOWN. SEE NOTE FOR ALTERNATE A �G, <br /> O <br /> H L <br /> z <br /> E SHEARWALL PER PLAN DIAPHRAGM EDGE SHEARWALL PER PLAN DIAPHRAGM EDGE NAILING INTO <br /> (WHERE SPECIFIED) NAILING INTO RIM JOIST (WHERE SPECIFIED) RIM JOIST(10d 0 6" O.C. MIN) 9 <br /> SHEARWALL EDGE NAILING <br /> (10d ®6"" o.c. MIN) SHEARWALL EDGE NAILING 16d EA JOIST(USE SDS}"x4" <br /> f; (WHERE APPLICABLE) (WHERE APPLICABLE) SCREWS FOR 3x BOTTOM PLATES) �NAI. <br /> HEADER PER PLAN 5 16d LTP4 FROM BOTTOM PLATE 6d ®EA JOIST(USE LTP4 FROM BOTTOM PLATE (2) BAYS OF JOIST BLOCKING <br /> NAILS EACH TO RIM JOIST PER SCHEDULE SDS}"x4}" SCREWS FOR 3x TO RIM JOIST PER SCHEDULE 48" o.c. w/(3) 10d NAILS INTO AUG 02,2023 <br /> (AT SHEARWALL ONLY) BOTTOM PLATES) (AT SHEARWALL ONLY) EACH BLOCK <br /> END <br /> DOUBLE TOP PLATE W/EDGE NAILING ©HOEDOWN PER SCHEDULE AND LTP4 FROM RIM JOIST TO LTP4 FROM RIM JOIST TO <br /> (STAGGER) PLAN (HDQ8-SDS3 SHOWN) /// TOP PLATE PER SCHEDULE TOP PLATE PER SCHEDULE <br /> ©SHEARWALL EDGE NAILING AT ALL PANEL (AT SHEARWALL ONLY) (AT SHEARWALL ONLY) Drawn By: CHRIS L. <br /> QCOORDINATE ALL STUD AND <br /> EDGES. BLOCKING AT ALL PANEL EDGES Checked By: CHRIS <br /> PLATE SIZES w/ SHEARWALL JOIST PER PLAN (I-JOIST FLOOR FRAMING PER PLAN (I-JOIST <br /> WHERE APPLICABLE 2X_ KING STUD SHEARWALL EDGE NAILING SHEARWALL EDGE NAILING Date: U7-14-2023 <br /> ©EDGE NAILING TO HOLDOWN POST(FULL SCHEDULE REQUIREMENTS (WHERE APPLICABLE) SHOWN, SOLID SAWN SIMILAR) (WHERE APPLICABLE) SHOWN, SOLID SAWN SIMILAR) <br /> HEIGHT) STAGGER INTO DOUBLE STUDS aJ EDGE NAILING TO POSTS, TRIM SHEARWALL PER PLAN 1}" RIM JOIST(MINIMUM) SHEARWALL PER PLAN 14" RIM JOIST(MINIMUM) <br /> 0 STUDS 0 16" ON CENTER STUDS, AND KING STUDS WHERE SPECIFIED (2) 16d NAILS O EACH WHERE SPECIFIED A34 FROM BLOCKING TO <br /> (E)PRESSURE TREATED SILL PLATE WITH BEARING STUD FOR HEADER 2X_ TRIM STUD 0R ( ) ( )JOIST TO TOP PLATE TOP PLATE SDA JOB N0. <br /> QK <br /> EDGE NAILING AND ANCHOR BOLTS PER POST PER PLAN 16d NAILS 9 489 A <br /> SHEARWALL SCHEDULE. ©RIMJOIST TO BE 1Y2" MIN <br /> ATOP PLATE SPLICE NAILING TO BE (8) 16d THICKNESS AT ALL @ 8 O/C <br /> SINKERS (MIN). LAP 48" MINIMUM. CENTER SHEARWALLS JOISTS PERPENDICULAR JOISTS PARALLEL <br /> SPLICE ON STUD' STRUCTURAL <br /> STD. SHEARWALL ELEVATION HEADER CONNECTION EXT. SHEARWALL/JOIST CONNECTION DETAILS <br /> g W RIM � � AT TOP 12 (SHEARWALLS 1 -5 ONLY) 2 22 <br />