My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vander Veen Construction Inc. 3/12/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Vander Veen Construction Inc. 3/12/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 2:27:47 PM
Creation date
3/12/2025 12:49:18 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Vander Veen Construction Inc.
Approval Date
3/12/2025
Council Approval Date
2/12/2025
End Date
9/30/2025
Department
Parks & Community Services
Department Project Manager
Lolly Huggins
Subject / Project Title
Everett Parks Restroom Renovation Project
Tracking Number
0004732
Total Compensation
$848,647.80
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1974
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Project #EV47 Bid Date: 1/7/2025 @ 2:00 pm PST <br />Everett Parks Restrooms Renovation, City of Everett, WA #PRK 2024-23007 <br />$850,000 <br />Low Bid: <br />Bids Received: 7 <br />Apparent Low Bid Vander Veen Construction Inc $ 848,647.80 <br />2nd Valdez Construction $ 1,031,742.00 <br />3rd TRICO $ 1,147,356.00 <br />Notice to Contractors <br />Forest Park Plans <br />Legion Park Plans <br />TA Sullivan Park Plans <br />Specs <br />Addendum #1 <br />Addendum #2 <br />Addendum #3 <br />Addendum #4 <br />Addendum #5 <br />Addendum #6 <br />Addendum #6 Plans <br />Addendum #7 <br />Bid Results <br />Register on this project. <br />View self registered Bidders List <br />Builders Exchange of Washington, Inc. Subs and Suppliers <br />Owner: <br />City of Everett <br />2930 Wetmore <br />Everett, WA 98201 <br />Issued by: <br />www.bxwa.com <br />Prebid: 10/30 and 11/5 @ 9:00 am on site <br />Description: <br />Work being performed includes, but is not limited to, furnishing all labor, materials, and equipment <br />necessary to perform Tenant Improvement Work at three locations commonly referred to as Legion <br />Park Restroom, Thornton A. Sullivan Park Restroom, and Forest Park Restroom to renovate three <br />existing restroom buildings, each at a different park location, based on a 100% Bid plan set dated <br />6/20/2024. The three project locations are figured to be bid and constructed under the same contract, <br />whether the work ends up being staggered by site or all done simultaneously. In either case, each <br />project area is figured to be closed to the public when contract work takes place there, and performing <br />all Work as required by the Contract Documents.
The URL can be used to link to this page
Your browser does not support the video tag.