My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-34 <br />1-05.11(2) Final Inspection and Physical Completion Date <br />When the Contractor considers the Work physically complete and ready for final <br />inspection, the Contractor, by written Notice, shall request the Engineer to schedule a <br />final inspection. The Engineer will set a date for final inspection. The Engineer and the <br />Contractor will then make a final inspection and the Engineer will notify the Contractor in <br />writing of all particulars in which the final inspection reveals the Work incomplete or <br />unacceptable. The Contractor shall immediately take such corrective measures as are <br />necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, <br />diligently, and without interruption until physical completion of the listed deficiencies. <br />This process will continue until the Engineer is satisfied the listed deficiencies have been <br />corrected. <br />If action to correct the listed deficiencies is not initiated within seven days after receipt of <br />the written notice listing the deficiencies, the Engineer may, upon written notice to the <br />Contractor, take whatever steps are necessary to correct those deficiencies pursuant to <br />1-05.7 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. <br />The Contractor will not be allowed an extension of Contract Time because of a Delay in <br />the performance of the Work attributable to the exercise of the Engineer’s right under the <br />authority of the Contract. <br />Upon correction of all deficiencies, the Engineer will notify the Contractor and the City, in <br />writing, of the date upon which the Work was considered physically complete. That date <br />shall constitute the Physical Completion Date of the Contract, but shall not imply <br />acceptance of the Work or that all the obligations of the Contractor under the Contract <br />have been fulfilled. <br />1-05.11(3) Operational Testing <br />It is the intent of the City to have at the Physical Completion Date a complete and <br />operable system. Therefore when the Work involves the installation of machinery or <br />other mechanical equipment; street lighting, electrical distribution or signal systems; <br />irrigation systems; buildings; or other similar work it may be desirable for the Engineer to <br />have the Contractor operate and test the Work for a period of time after final inspection <br />but prior to the Physical Completion Date. Whenever items of Work are listed in the <br />Contract Documents for operational testing they shall be fully tested under operating <br />conditions for the time period specified to ensure their acceptability prior to the Physical <br />Completion Date. During and following the test period, the Contractor shall correct any <br />items of workmanship, materials, or Equipment that prove faulty, or that are not in first <br />class operating condition. Equipment, electrical controls, meters, or other devices and <br />Equipment to be tested during this period shall be tested under the observation of the <br />Engineer, so that the Engineer may determine their suitability for the purpose for which <br />they were installed. The Physical Completion Date cannot be established until testing <br />and corrections have been completed to the satisfaction of the Engineer. <br />The costs for power, gas, labor, material, supplies, and everything else needed to <br />successfully complete operational testing, shall be included in the unit contract prices <br />related to the system being tested, unless specifically set forth otherwise in the Proposal. <br />Operational and test periods, when required by the Engineer, shall not affect a <br />manufacturer’s guaranties or warranties furnished under the terms of the Contract. <br />1-05.12 Final Acceptance <br />Delete all of 1-05.12 and substitute the following: