My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-37 <br />1-05.18 Contractor <br />(*****) <br />1-05.18(1) Contractor's Representative <br />The Contractor shall notify the City in writing of the name of the person who will act as <br />the Contractor's representative, will have the authority to act in matter relating to this <br />Contract, and will be delegated with authority to act as the Contractor’s emergency <br />contact. This person shall have authority to carry out the provisions of the Contract and <br />to supply materials, Equipment, tools and labor without delay for the performance of the <br />Work. <br />Contractor shall employ and keep on site on a full time basis personnel experienced in <br />the management of construction of projects of this size and type. These shall include, <br />but not be limited to, a project manager and superintendent. Unless the City agrees <br />otherwise in writing, neither the Contractor’s project manager nor the superintendent <br />shall have supervisory responsibility for other projects for the Contractor while assigned <br />to this Project. Contractor shall employ and assign such additional, full time office, <br />support and engineering personnel to support the project manager and superintendent <br />and allow timely completion of the Project. The project manager and superintendent <br />shall be approved by the City, and such approval shall not be unreasonably withheld. <br />Contractor shall submit personnel qualifications within seven (7) days of Contractor’s <br />execution of the Contract. Basis for disapproval include, but are not limited to, lack of <br />sufficient experience managing the construction of similar type or size projects or <br />relationships on other projects unsatisfactory to the City or, if the Project is subject to <br />supplemental bidder responsibility criteria and such criteria contain personnel <br />qualifications, the personnel differ from those named by Bidder in its pre-Award <br />supplemental bidder responsibility criteria submittals. City may require removal and <br />replacement of Contractor’s supervisory staff who are disruptive or who appear to lack <br />sufficient competence to complete the Project successfully. <br />1-05.18(2) Construction Procedures <br />The Contractor shall supervise and direct the Work and determine the means, methods, <br />techniques, sequences and procedures of construction, except in those instances where <br />the City, to define the quality of an item of Work, specifies in the Contract a means, <br />method, technique, sequence or procedure for construction of that item of Work. The <br />Contractor shall execute Work in conformity with the standard practice of the trade. <br />1-05.18(3) Responsibilities <br />1-05.18(3)A Manufacturers and Suppliers <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br />manufacturers, Suppliers and their employees. <br />1-05.18(3)B Contractor's Employees <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of its <br />employees. Workers shall have sufficient knowledge, skill and experience to perform <br />properly the Work assigned to them. <br />1-05.18(3)C Payment for Labor and Materials <br />The Contractor shall pay and require its Subcontractors to pay any and all accounts <br />for labor including Worker's Compensation premiums, State Unemployment and <br />Federal Social Security payments and other wage and salary deductions required by <br />law. The Contractor also shall pay and cause its Subcontractors to pay any and all
The URL can be used to link to this page
Your browser does not support the video tag.