My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-60 <br />Street right of way lines, limits of easements, and limits of construction permits are <br />indicated on the Plans. The Contractor’s construction activities shall be confined within <br />these limits, unless arrangements for use of private property are made. <br />Generally, the City will have obtained, prior to bid opening, all rights of way and <br />easements, both permanent and temporary, necessary for carrying out the Work. <br />Exceptions to this are noted on the Plans. <br />Whenever any of the Work is accomplished on or through property other than public <br />right of way, the Contractor shall meet and fulfill all covenants and stipulations of any <br />easement agreement obtained by the City from the owner of the private property. Copies <br />of the easement agreements may be included in the Contract Documents or made <br />available to the Contractor as soon as practical after they have been obtained by the <br />Engineer. <br />The Contractor shall not proceed with any portion of the Work in areas where right of <br />way, easements or rights of entry have not been acquired until the Engineer certifies to <br />the Contractor that the right of way or easement is available or that the right of entry has <br />been received. If the Contractor is delayed due to acts of omission on the part of the City <br />in obtaining easements, rights of entry or right of way, the Contractor will be entitled to <br />an extension of time. The Contractor agrees that Delay resulting from City obtaining <br />easement or right of entry or right of way shall not be a breach of Contract. <br />Each property owner shall be given 48 hours notice prior to entry by the Contractor. This <br />includes entry onto easements and private property where private improvements must <br />be adjusted. <br />The Contractor shall be responsible for providing, without expense or liability to the City, <br />any additional land and access thereto that the Contractor may desire for temporary <br />construction facilities, storage of materials, or other Contractor needs. However, before <br />using any private property, whether adjoining the Work or not, the Contractor shall file <br />with the Engineer a written permission of the private property owner, and, upon vacating <br />the premises, a written release from the property owner of each property disturbed or <br />otherwise interfered with by reasons of construction pursued under this Contract. The <br />statement shall be signed by the private property owner, or proper authority acting for <br />the owner of the private property affected, stating that permission has been granted to <br />use the property and all necessary permits have been obtained or, in the case of a <br />release, that the restoration of the property has been satisfactorily accomplished. The <br />statement shall include the parcel number, address, and date of signature. Written <br />releases shall be filed with the Engineer before the Completion Date will be established. <br />1-07.27 No Waiver of State’s Legal Rights <br />Delete 1-07.27 and substitute the following: <br />1-07.27 No Waiver of City’s Legal Rights <br />(*****) <br />The City shall not be precluded or estopped by any measurement, estimate, or certificate <br />made either before or after the completion and acceptance of the Work and payment <br />therefor from showing the true amount and character of the Work performed and materials <br />furnished by the Contractor, or from showing that any such measurement, estimate, or <br />certificate is untrue or incorrectly made, or that the Work or materials do not conform in fact <br />to the Contract. The City shall not be precluded or estopped, notwithstanding any such <br />measurement, estimate, or certificate, and payment in accordance therewith, from <br />recovering from the Contractor and the Sureties such damages as it may sustain by reason
The URL can be used to link to this page
Your browser does not support the video tag.