My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-62 <br />writing to the Engineer for permission to work such times. Permission to work longer <br />than an 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. Such requests <br />shall be submitted to the Engineer no later than noon on the working day prior to the day <br />for which the Contractor is requesting permission to work, unless a noise variance will be <br />required. In such case provide request a minimum of 30 days prior to performing the <br />work in accordance with 1-07.1(7) NOISE. <br />Permission to work Saturdays, Sundays, holidays or other than the agreed upon normal <br />straight time working hours Monday through Friday may be given subject to certain other <br />conditions set forth by the City or Engineer. These conditions may include, and not be <br />limited to; requiring the Contractor to reimburse the City for the costs in excess of <br />straight-time costs for City employees and necessary assistants who worked during such <br />times, on non-Federal aid projects. Assistants may include, and are not limited to, survey <br />crews; personnel from the City’s material testing lab; inspectors; and other City <br />employees when in the opinion of the Engineer, such work necessitates their presence. <br />The work performed on Saturdays, Sundays, and holidays will be considered as working <br />days with regards to the Contract Time; and considering multiple work shifts as multiple <br />working days with respect to Contract Time even though the multiple shifts occur in a <br />single 24-hour period. <br />1-08.0(3) Reimbursement for Overtime Work of City Employees and Assistants <br />Where the Contractor elects to work on a Saturday, Sunday, or holiday, or longer than <br />an 8-hour work shift on a regular working day, as defined in the Standard Specifications, <br />such work shall be considered as overtime work. On all such overtime work an inspector <br />will be present, and a survey crew may be required at the discretion of the Engineer. If <br />such work is the result of Contractor’s inability to complete work or coordinate materials, <br />equipment and labor in accordance with agreed schedule, then the City may deduct from <br />amounts due or to become due to the Contractor for the costs in excess of the straight- <br />time costs for employees and assistants of the City required to work overtime hours. <br />The Contractor by these specifications does hereby authorize the Engineer to deduct <br />such costs from the amount due or to become due to the Contractor. <br />1-08.1 Subcontracting <br />Delete 1-08.1(7)A Payment Certification and substitute the following: <br />On all projects funded only with City funds, the Contractor shall certify to the actual <br />amounts paid Disadvantaged, Minority, or Women’s Business Enterprise firms that were <br />used as subcontractors, lower tier subcontractors, manufacturers, regular dealers, or <br />service providers on the Contract. This certification shall be submitted to the Engineer on <br />WSDOT form 140-542 within 20 calendar days after physical completion of the Contract. <br />Supplement 1-08.1 by adding the following: <br />The Contract Documents shall apply to Subcontractors and suppliers as if each had <br />signed the Contract with the City. Contractor shall include the provisions of these <br />Contract Documents or a “flow down” clause in each contract with Subcontractors and <br />suppliers. <br />The City will not approve a Subcontractor that is also providing services to the City on <br />the same project. <br />In addition to any other requirement in this Section, no Subcontractor or lower tier <br />subcontractor will be permitted to perform Work under the Contract until the following <br />documents have been completed and submitted to the Engineer:
The URL can be used to link to this page
Your browser does not support the video tag.