My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-68 <br />Contractor shall identify any and all Work furnished by City and installed by City on <br />the construction schedule. <br />1-08.3(4) Measurement <br />Delete 1-08.3(4) <br />1-08.3(5) Payment <br />Delete 1-08.3(5) and substitute the following: <br />Costs incurred in performance of this Work shall be included in the contract bid items <br />and no direct compensation shall be paid. <br />1-08.4 Prosecution of Work <br />Delete 1-08.4 and substitute the following: <br />1-08.4 Notice to Proceed and Prosecution of Work <br />(*****) <br />The City will issue a Notice to Proceed after the Contract has been executed and the <br />Contract Bonds and evidence of insurance have been approved and filed by the City. The <br />Contractor shall not commence with the Work until the Notice to Proceed has been given by <br />the City. The Contractor shall commence construction activities on the Project site within 14 <br />calendar days of the Notice to Proceed Date, unless otherwise approved in writing. The <br />Contractor shall diligently pursue the Work to the Physical Completion Date within the time <br />specified in the Contract. Voluntary shutdown or slowing of operations by the Contractor <br />shall not relieve the Contractor of the responsibility to complete the Work within the time(s) <br />specified in the Contract. <br />The City is not obligated to accept or pay for Work performed by the Contractor or be liable <br />for any Delays, prior to delivery of the Notice to Proceed. The City’s knowledge of Work <br />being performed prior to delivery of the Notice to Proceed will not obligate the City to accept <br />or pay for such Work. Contractor waives any and all Contract Claims for an adjustment of <br />Contract Sum or Contract Time arising out of, or related to, Work it performs prior to receipt <br />of the Notice to Proceed. <br />The City may issue partial Notices to Proceed. Contractor may seek permission in writing to <br />perform some Work prior to issuance to the Notice to Proceed, such as shop drawings, <br />equipment and material Submittals, or surveying and the City or City’s Representative may, <br />in its sole discretion, approve in writing such Work prior to the issuance of the Notice to <br />Proceed. <br />Supplement 1-08.4 by adding the following: <br />1-08.4(1) Construction Progress <br />(*****) <br />The Contractor shall furnish all labor, materials, facilities and Equipment necessary to <br />ensure the prosecution and completion of the Project within the interim milestones, <br />Substantial Completion, Physical Completion and Completion Dates of the Contract. If <br />Work falls seven calendar days or more behind the reviewed Preliminary Schedule, the <br />Contractor agrees that, at its sole cost and expense, it will take all actions necessary to <br />return the Project to the accepted schedule. These actions may include the following: <br />a. Increase labor in quantities and crafts.
The URL can be used to link to this page
Your browser does not support the video tag.