CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-1 <br />DIVISION B - BID ITEM DESCRIPTIONS <br />Bid Item 1 - Mobilization <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for mobilization shall constitute complete compensation for all of <br />Contractor’s preconstruction costs of preparatory work and operations including, but not <br />limited to, those necessary for the movement of the Contractor’s personnel, equipment, <br />supplies and incidentals to the Project; for the establishment of its offices, buildings and <br />other facilities necessary for Work on this Project; for premiums on bonds and insurance for <br />the Project, and for Work and operations that the Contractor must perform or costs it must <br />incur before beginning production work on the various items on the Project. Mobilization <br />also includes, but is not limited to, posting construction identification signs, securing <br />permits, establishing safety and security measures, preparing a traffic control plan(s), <br />preconstruction photographs, developing a Schedule of Values for lump sum bid items, <br />submitting the project schedule and providing product and material submittals, and posting <br />of notices and jobsite posters as required by WSDOT 1-07.9(2). Also include mobilization <br />costs for all subcontracted work along with all costs for utility coordination noted on the <br />Plans and in the Specifications. <br />Items not included in this item include, but are not limited to: <br />(a) Work covered by a specific bid item or Work that is to be included in a bid item <br />or items. <br />(b) Profit, interest on borrowed money, overhead or management costs. <br />Partial payments will be made for the lump sum contract price for “Mobilization” as follows: <br />(a) When 5% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for mobilization, or 5% of the total original contract <br />amount, whichever is the least, will be paid. <br />(b) When 10% of the total original contract amount is earned from other bid items. <br />100% of the amount bid for mobilization, or 10% of the total contract amount, <br />whichever is the least, will be paid. <br />Upon substantial completion, payment of any amount bid for mobilization in excess of 10% <br />of the total original contract amount will be paid. <br />Bid Item 2 - Minor Changes <br />Measurement and Payment: Force Account (FA) <br />Payments for credits will be determined in accordance with Section 1-09.4. For the purpose <br />of providing a common Proposal for all Bidders, The Contracting Agency has entered an <br />amount for “Minor Changes” in the Proposal to become a part of the total Bid by the <br />Contractor. <br />Bid Item 3 - Surveying <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for surveying includes, but is not limited to, all costs associated with <br />furnishing all labor, tools, survey instruments, materials, and other equipment necessary for <br />the setting and monitoring the location, elevation, alignment and grade of the Work as <br />specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES <br />and the Plans.