My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-1 <br />DIVISION B - BID ITEM DESCRIPTIONS <br />Bid Item 1 - Mobilization <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for mobilization shall constitute complete compensation for all of <br />Contractor’s preconstruction costs of preparatory work and operations including, but not <br />limited to, those necessary for the movement of the Contractor’s personnel, equipment, <br />supplies and incidentals to the Project; for the establishment of its offices, buildings and <br />other facilities necessary for Work on this Project; for premiums on bonds and insurance for <br />the Project, and for Work and operations that the Contractor must perform or costs it must <br />incur before beginning production work on the various items on the Project. Mobilization <br />also includes, but is not limited to, posting construction identification signs, securing <br />permits, establishing safety and security measures, preparing a traffic control plan(s), <br />preconstruction photographs, developing a Schedule of Values for lump sum bid items, <br />submitting the project schedule and providing product and material submittals, and posting <br />of notices and jobsite posters as required by WSDOT 1-07.9(2). Also include mobilization <br />costs for all subcontracted work along with all costs for utility coordination noted on the <br />Plans and in the Specifications. <br />Items not included in this item include, but are not limited to: <br />(a) Work covered by a specific bid item or Work that is to be included in a bid item <br />or items. <br />(b) Profit, interest on borrowed money, overhead or management costs. <br />Partial payments will be made for the lump sum contract price for “Mobilization” as follows: <br />(a) When 5% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for mobilization, or 5% of the total original contract <br />amount, whichever is the least, will be paid. <br />(b) When 10% of the total original contract amount is earned from other bid items. <br />100% of the amount bid for mobilization, or 10% of the total contract amount, <br />whichever is the least, will be paid. <br />Upon substantial completion, payment of any amount bid for mobilization in excess of 10% <br />of the total original contract amount will be paid. <br />Bid Item 2 - Minor Changes <br />Measurement and Payment: Force Account (FA) <br />Payments for credits will be determined in accordance with Section 1-09.4. For the purpose <br />of providing a common Proposal for all Bidders, The Contracting Agency has entered an <br />amount for “Minor Changes” in the Proposal to become a part of the total Bid by the <br />Contractor. <br />Bid Item 3 - Surveying <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for surveying includes, but is not limited to, all costs associated with <br />furnishing all labor, tools, survey instruments, materials, and other equipment necessary for <br />the setting and monitoring the location, elevation, alignment and grade of the Work as <br />specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES <br />and the Plans.
The URL can be used to link to this page
Your browser does not support the video tag.