Laserfiche WebLink
CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-10 <br />and incidental for the installation, maintenance and removal of the Temporary Erosion and <br />Sedimentation Control (TESC) facilities to prevent pollution, erosion, siltation, and damage <br />to any wetland, stream, other watercourse, or surrounding property throughout the life of <br />the Contract. TESC facilities shall include, but not be limited to, any cover measures, runoff <br />control measures, soil and site stabilization measures, silt fencing as shown on the Plans, <br />and inlet protection measures for the work area and downstream areas. <br />The TESC measures shall limit the erosion possibility by covering disturbed soils, <br />preventing sloughing or raveling of cut and natural slopes, and controlling surface runoff <br />from flowing into excavations using measures such as curbs, berms, dikes, rock-lined <br />ditches, and other approved measures. Filter fabric fence shall be used to treat small areas <br />of non-concentrated runoff prior to discharge from the site. <br />Bid Item 38 - Inlet Protection <br />Measurement and Payment: Each (EA) <br />Measurement and payment of Inlet Protection shall be for each Inlet Protection device <br />installed per Section 8-01 of the Standard Specification, plan and standard details. <br />Maintenance of Inlet Protection devices will be paid for under the bid item Erosion/Water <br />Pollution Control. <br />Bid Item 39 - Topsoil Type A <br />Measurement and Payment: (CY) <br />The contract bid price for “Topsoil Type A” per cubic yard, shall be full compensation for all <br />labor, material, tools, equipment, and supplies necessary to fine grade, place, cultivate, and <br />cleanup for the depth of topsoil called for in the Plans. <br />Bid Item 40 - Compost <br />Measurement and Payment: (CY) <br />The contract bid price for “Compost” per cubic yard, shall be full compensation for all labor, <br />material, tools, equipment, and supplies necessary to fine grade, place, cultivate, and <br />cleanup for the depth of compost called for in the Plans. <br />Bid Item 41 - Mulch <br />Measurement and Payment: (CY) <br />The contract bid price for “Arborist Wood Chip Mulch” per cubic yard, shall be full <br />compensation for all labor, material, tools, equipment, and supplies necessary to fine <br />grade, place, cultivate, and cleanup for the particular item called for in the Plans. <br />Bid Item 42 - PSIPE Plantings <br />Measurement and Payment: Lump Sum (LS) <br />The unit Contract price Lump Sum (LS) for “PSIPE Plantings” (Plant Selection Including <br />Plant Establishment) will be full pay for all Work to perform as specified within the planting <br />area for weed control and planting area preparation, planting, staking, cleanup, and water <br />necessary to complete planting operations as specified to the end of first year plant <br />establishment. <br />As the plants that include plant establishment are obtained, propagated, and grown, partial <br />payments will be made as follows after inspection by the Engineer: