My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Mall Bus Platform ADVERTISEMENT FOR BIDS December 2024 <br />WO No – MALLSTN/24462 <br />CERTIFICATE OF ENGINEER <br />EVERETT MALL BUS PLATFORM <br />City of Everett <br />December 2024 <br />These bidding and contract documents have been prepared by, or under the direction of, the <br />following registered professional engineer, licensed in accordance with the laws of the State of <br />Washington to practice in the State of Washington: <br />Darrell Smith, PE <br />PACE Engineers <br />11255 Kirkland Way, Suite 300 <br />Kirkland, Washington 98033-3417 <br />425.827.2014 <br />PACE Project No. 24462 <br />Date: 2025.01.24 <br />14:40:30-08'00'
The URL can be used to link to this page
Your browser does not support the video tag.