Laserfiche WebLink
CITY OF EVERETT <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform CONTRACT December 2024 <br />WO No – MALLSTN/24462 C-1 <br /> <br />CITY OF EVERETT, WASHINGTON <br /> <br />CONTRACT <br /> <br />THIS CONTRACT is made and entered into by and between the City of Everett, Washington, a <br />municipal corporation existing under the laws of the State of Washington (the “City”) and <br />_______________________________________________________ ( “Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br />agrees to furnish all labor, tools, materials, equipment, and supplies required to complete in a <br />workmanlike manner the work, improvements, and appurtenances in accordance with the <br />Specifications and Plans and all other Contract Documents entitled: “Everett Mall Bus Platform” <br />(the “Project”). <br />1. Contract Documents. This Contract is the written agreement signed between the City and <br />Contractor and includes Division C – CONTRACT, Division P - PROPOSAL, Division B – BID <br />ITEM DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications, Standard <br />Plans in effect as of the date Bids are opened, Addenda, supplemental agreements, change <br />orders, certifications and affidavits required by this Contract and by law, and Federal <br />requirements that apply to this Contract and Project, all of which are referred to as the “Contract <br />Documents” and all of which are hereby incorporated by reference. A copy of the Contract <br />Documents that were posted for the Project on Builder’s Exchange of Washington <br />(www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office as a single pdf <br />and is available as follows: <br /> <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to signing <br />this Contract. City and Contractor agree that this pdf contains all posted Contract Documents <br />as of the Bid Opening Date. City and Contractor further agree that this pdf may contain some <br />other documents (such as Reference Information) that are not Contract Documents. <br />2. Contract Time. Substantial completion shall be achieved within One Hundred (100) working <br />days after the effective date of the Notice to Proceed. Physical completion shall be within <br />Fifteen (15) working days after the actual date of issuance of substantial completion. <br />3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br />expense in the event that the Contractor does not complete the work in all respects and have it <br />ready for use by the substantial completion date stated. Because it is difficult to accurately <br />compute the amount of such costs and damages, the Contractor hereby covenants and agrees <br />to pay to the City liquidated damages as computed in Section 1-08.9 of the Standard <br />Specifications, as may be amended by the Special Provisions, for each and every working day <br />required to accomplish substantial completion of the work in excess of the period established <br />above for substantial completion. For overruns in contract time occurring after the physical <br />completion date, liquidated damages shall be assessed at the rate computed in Section 1-08.9 <br />of the Standard Specifications, as may be amended by the Special Provisions, until the work is <br />physically complete. <br />4. Contract Sum. The Contract Sum of this Contract is: <br />Contract Sum <br />This is based on the proposal/bid submitted by Contractor dated ________________. A copy of <br />such proposal/bid is attached hereto. The basis for final payment will be the actual amount of