My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform SPECIAL PROVISIONS December 2024 <br />WO No – MALLSTN/24462 SP-ii <br />1-04.4(1) City’s Right to Direct Changes to the Work ....................................................... 19 <br />1-04.4(2) Extra Work ....................................................................................................... 19 <br />1-04.4(3) Change Orders ................................................................................................. 19 <br />1-04.4(4) Value Engineering and Cost Sharing ................................................................ 20 <br />1-04.5 Notice by Contractor ...........................................................................................20 <br />1-04.5(1) When Notice Must Be Given ............................................................................. 20 <br />1-04.5(2) Form of Notice .................................................................................................. 21 <br />1-04.5(3) Supplemental Information ................................................................................. 22 <br />1-04.5(4) Contract Claim .................................................................................................. 22 <br />1-04.7 Differing Site Conditions (Changed Conditions) ..................................................22 <br />1-05 CONTROL OF WORK .....................................................................................................23 <br />1-05.1 City .....................................................................................................................23 <br />1-05.1(2) Requests for Information (RFI) ......................................................................... 23 <br />1-05.2 City’s Representative ..........................................................................................25 <br />1-05.3 Working Drawings ...............................................................................................26 <br />1-05.3(1) Submittals ........................................................................................................ 28 <br />1-05.3(2) Requests for Information .................................................................................. 29 <br />1-05.4 Conformity With and Deviations From Plans and Stakes.....................................29 <br />1-05.6 Inspection of Work and Materials ........................................................................30 <br />1-05.6(1) Demonstration of Compliance with Contract Requirements .............................. 31 <br />1-05.6(2) Manufacturer's Directions ................................................................................. 31 <br />1-05.6(3) Materials and Equipment Furnished by City ..................................................... 31 <br />1-05.7 Removal of Defective and Unauthorized Work ....................................................31 <br />1-05.10 Guarantees .........................................................................................................32 <br />1-05.11 Final Inspections and Operational Testing ..........................................................33 <br />1-05.11(1) Substantial Completion Date ............................................................................ 33 <br />1-05.11(2) Final Inspection and Physical Completion Date ................................................ 34 <br />1-05.11(3) Operational Testing .......................................................................................... 34 <br />1-05.12 Final Acceptance ................................................................................................34 <br />1-05.13 Superintendents, Labor and Equipment of Contractor .........................................35 <br />1-05.14 Cooperation With Other Contractors ...................................................................35 <br />1-05.16 Water and Power ................................................................................................36 <br />1-05.17 Oral Agreements .................................................................................................36 <br />1-05.18 Contractor ...........................................................................................................37 <br />1-05.18(1) Contractor's Representative ............................................................................. 37 <br />1-05.18(2) Construction Procedures .................................................................................. 37 <br />1-05.18(3) Responsibilities ................................................................................................ 37 <br />1-05.18(3)A Manufacturers and Suppliers ...................................................................37 <br />1-05.18(3)B Contractor's Employees ...........................................................................37 <br />1-05.18(3)C Payment for Labor and Materials .............................................................37 <br />1-05.18(3)D Attention to Work .....................................................................................38 <br />1-05.18(3)E Safety ......................................................................................................38 <br />1-05.18(3)F Threats, Intimidation and Harassment Forbidden ....................................38 <br />1-05.18(3)G Weapons Forbidden ................................................................................38 <br />1-05.18(3)H Safety Standards .....................................................................................39 <br />1-05.18(3)I Public Safety and Convenience ...............................................................39 <br />1-05.19 City-Contractor Coordination ...............................................................................39 <br />1-05.19(1) Suggestions to Contractor ................................................................................ 39 <br />1-05.19(2) Meetings with City ............................................................................................ 40 <br />1-05.19(3) Cooperation with Others ................................................................................... 40 <br />1-06 CONTROL OF MATERIAL ..............................................................................................40 <br />1-06.1 Approval of Materials Prior to Use .......................................................................40
The URL can be used to link to this page
Your browser does not support the video tag.