My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform SPECIAL PROVISIONS December 2024 <br />WO No – MALLSTN/24462 SP-vi <br />1-10.3 Flagging, Signs, and All Other Traffic Control Devices ...................................... 100 <br />1-10.3(1) General .......................................................................................................... 100 <br />1-10.3(2) Maintenance and Protection of Traffic Control ................................................ 100 <br />1-10.3(3) No Passing Zones .......................................................................................... 101 <br />1-10.3(4) Traffic Control Labor ....................................................................................... 101 <br />1-10.3(4)A Traffic Control - Off-Duty Police Officer .................................................. 102 <br />1-10.3(5) Construction Signs ......................................................................................... 102 <br />1-10.4 Measurement ................................................................................................... 103 <br />1-10.4(1) General .......................................................................................................... 103 <br />1-10.4(2) Measurement ................................................................................................. 104 <br />1-10.5 Payment ............................................................................................................ 104 <br />1-11 MISCELLANEOUS ........................................................................................................ 104 <br />1-11.1 Construction ...................................................................................................... 104 <br />1-11.2 Applicable Law and Choice of Forum ................................................................ 104 <br />1-11.3 Severability ....................................................................................................... 104 <br />1-11.4 Headings for Convenience ................................................................................ 104 <br />1-11.5 Waiver ............................................................................................................... 104 <br />1-11.6 City of Everett Business License ....................................................................... 104 <br />1-11.7 Compliance with Federal, State and Local Laws ............................................... 104 <br />1-11.8 Complete Agreement ........................................................................................ 105 <br />1-11.9 Successors Bound ............................................................................................ 105 <br />1-11.10 Effective Date .................................................................................................... 105 <br />1-11.11 Contractor Registration ..................................................................................... 105 <br />1-11.12 Electronic Signature .......................................................................................... 105 <br />DIVISION 2 – EARTHWORK .................................................................................................. 107 <br />2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP .................................................. 107 <br />2-01.2 Disposal of Usable Material and Debris ............................................................. 107 <br />2-01.2(1) Disposal Method No.1 – Open Burning........................................................... 107 <br />2-01.4 Measurement .................................................................................................... 107 <br />2-01.5 Payment ............................................................................................................ 107 <br />2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS ................................................. 107 <br />2-02.1 Description ........................................................................................................ 107 <br />2-02.3 Construction Requirements ............................................................................... 107 <br />2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures ................. 107 <br />2-02.3(3) Removal of Existing Street Improvements ...................................................... 108 <br />2-02.3(3)A Description ............................................................................................ 108 <br />2-02.3(3)B Removal of Pavement ........................................................................... 108 <br />2-02.3(3)B1 Sawcutting ....................................................................................... 108 <br />2-02.3(3)C Removal of Curb, Curb and Gutter ........................................................ 108 <br />2-02.3(3)C1 Sawcutting ....................................................................................... 108 <br />2-02.3(3)D Removal of Cement Concrete Sidewalks ............................................... 108 <br />2-02.3(3)D1 Sawcutting ....................................................................................... 109 <br />2-02.3(3)E Removal of Catch Basins, Manholes, Inlets or Sumps ........................... 109 <br />2-02.3(4) Obliteration of Pavement Markings ................................................................. 109 <br />2-02.3(5) Abandon Pipe In-place ................................................................................... 109 <br />2-02.3(6) Sawing and Line Drilling ................................................................................. 109 <br />2-02.3(7) Salvage .......................................................................................................... 110 <br />2-02.3(8) Waste Disposal .............................................................................................. 110 <br />2-02.3(9) Abandon Existing Water Valves In-place ........................................................ 110 <br />2-02.4 Vacant ............................................................................................................... 110 <br />2-02.5 Payment ............................................................................................................ 110
The URL can be used to link to this page
Your browser does not support the video tag.