My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform SPECIAL PROVISIONS December 2024 <br />WO No – MALLSTN/24462 SP-ix <br />5-04.3(16) HMA Road Approaches .................................................................................. 137 <br />5-04.4 Measurement .................................................................................................... 137 <br />5-04.5 Payment ............................................................................................................ 138 <br />5-06 PAVEMENT PATCHING ................................................................................................ 138 <br />5-06.1 Description ........................................................................................................ 138 <br />5-06.2 Materials ........................................................................................................... 138 <br />5-06.3 Construction Requirements ............................................................................... 138 <br />5-06.3(1) General .......................................................................................................... 138 <br />5-06.3(2) Cement Concrete Pavement Patch ................................................................ 139 <br />5-06.3(3) Cement Concrete Pavement Resurfaced with HMA ....................................... 139 <br />5-06.3(4) HMA on Granular Base .................................................................................. 139 <br />5-06.3(5) Untreated Roadway Surfaces ......................................................................... 140 <br />5-06.3(6) Temporary Pavement Patching ...................................................................... 140 <br />5-06.3(7) Incidental Pavement Patching ........................................................................ 140 <br />5-06.4 Measurement .................................................................................................... 140 <br />5-06.5 Payment ............................................................................................................ 140 <br />DIVISION 6 STRUCTURES ................................................................................................. 141 <br />6-11 REINFORCED CONCRETE WALLS ............................................................................. 141 <br />6-11.1 Description ........................................................................................................ 141 <br />6-11.3 Construction Requirements ............................................................................... 141 <br />6-11.3(4) Cast-In-Place Concrete Construction ............................................................. 141 <br />6-11.4 Measurement .................................................................................................... 141 <br />6-11.5 Payment ............................................................................................................ 141 <br />6-23 TRANSIT SHELTER ...................................................................................................... 141 <br />6-24 RESTROOM BUILDING COMPLETE ............................................................................ 142 <br />DIVISION 7 – DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER <br />MAINS, AND CONDUITS ....................................................................................................... 143 <br />7-04 STORM SEWERS ......................................................................................................... 143 <br />7-04.1 Description ........................................................................................................ 143 <br />7-04.1(1) Submittals ...................................................................................................... 143 <br />7-04.2 Materials ........................................................................................................... 143 <br />7-04.4 Measurement .................................................................................................... 143 <br />7-04.5 Payment ............................................................................................................ 144 <br />7-05 MANHOLES, INLETS, AND CATCH BASINS ................................................................ 144 <br />7-05.1 Description ........................................................................................................ 144 <br />7-05.1(1) Submittals ...................................................................................................... 144 <br />7-05.2 Materials ........................................................................................................... 144 <br />7-05.3 Construction Requirements ............................................................................... 144 <br />7-05.3(1) Adjusting Manholes and Catch Basins to Grade ............................................. 145 <br />7-05.3(3) Connections to Existing Manholes .................................................................. 145 <br />7-05.3(4) Drop Manhole Connections ............................................................................ 146 <br />7-05.3(5) Furnish and Install Solid Lid for Catch Basins ................................................. 146 <br />7-05.4 Measurement .................................................................................................... 146 <br />7-05.5 Payment ............................................................................................................ 147 <br />7-08 GENERAL PIPE INSTALLATION REQUIREMENTS ..................................................... 147 <br />7-08.1 Description ........................................................................................................ 147 <br />7-08.1(1) Submittals ...................................................................................................... 147 <br />7-08.2 Materials ........................................................................................................... 147 <br />7-08.3 Construction Requirements ............................................................................... 147 <br />7-08.3(1) Excavation and Preparation of Trench ............................................................ 147
The URL can be used to link to this page
Your browser does not support the video tag.