Laserfiche WebLink
CITY OF EVERETT <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-1 <br />DIVISION 1. GENERAL REQUIREMENTS <br />Supplement Division 1 by adding the following: <br />General Description and Location of Project <br />(*****) <br />Work being performed includes furnishing all labor, materials and equipment necessary to <br />construct 400 linear feet concrete transit platform, concrete pavement loading zone, HMA <br />pavement, restroom building, related transit center improvements, and other such <br />appurtenances and performing all Work as required by the Contract, in accordance with the <br />Contract Plans and Contract Provisions. <br />The Project is in Everett, Washington, and is generally located at Everett Mall South parking <br />lot, located south of SE Everett Mall Way. <br />Design Engineer <br />(*****) <br />Questions and inquiries about these Contract Documents should be directed in writing to the <br />attention of Sabina Araya, City Project Manager, SAraya@everettwa.gov. <br />Standard Specifications <br />(*****) <br />All Work under this Contract shall be performed in accordance with the following <br />Specifications except as may be exempted or modified by other sections of these Contract <br />Documents. These Specifications are incorporated by reference, made a part of this <br />Contract and shall control and guide all activities within this Project whether referred to <br />directly, paragraph by paragraph. <br />WSDOT/APWA “2025 Standard Specifications for Road, Bridge and Municipal <br />Construction”, hereinafter referred to as the “Standard Specifications.” <br />The Standard Specifications, as modified or supplemented by these Special Provisions, all <br />of which are made a part of the Contract Documents, shall govern all of the Work. The <br />following latest edition of other specifications and standard plans shall apply to the extent to <br />which they are called out in the Contract Documents: <br />1. City of Everett “Design and Construction Standards and Specifications”, latest <br />edition as found on the Web at “http://everettwa.gov/DocumentCenter/View/243”. <br />2. “Standard Plans for Road and Bridge Construction”, as prepared by WSDOT. <br />3. “Manual on Uniform Traffic Control Devices (MUTCD).” <br />4. APWA Standards. <br />5. AWWA Standards. <br />Each Provision of these Special Provisions either supplements, modifies, or replaces the <br />comparable Standard Specification, or is a new Provision. The deletion, amendment, <br />alteration, or addition to any subsection or portion of the Standard Specifications is meant to <br />pertain only to that particular portion of the section, and in no way should it be interpreted <br />that the balance of the section does not apply. <br />Sections and subsections in the Special Provisions labeled under the headers with (*****) <br />indicate City of Everett Provisions.