My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/03/12 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/03/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 8:06:42 AM
Creation date
3/13/2025 8:03:52 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: <br />An Ordinance Amending Ordinance No. 4019-24 Entitled a Special Improvement Project Entitled “Thornton A. <br />Sullivan Park Floating Dock Repairs”, Fund 354, Program 100, to Accumulate All Costs for the Project <br />Council Bill # <br />CB 2502-19 <br />Project: Thornton A. Sullivan Park Floating Dock Repairs <br />Partner/Supplier: Reid Middleton Engineers <br /> Location: 11405 W Silver Lake Rd, Everett <br />Preceding action: Funding Ordinance 4019-24 <br />Fund: Fund 354, Program 100 (CIP-3) <br />Agenda dates requested: <br /> <br />Briefing <br />1st Reading 3/12/25 <br />2nd Reading 3/19/25 <br />Consent <br />Action 3/26/25 <br />Ordinance X <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Funding Ordinance <br /> <br />Department(s) involved: <br />Parks & Facilities <br /> <br /> <br />Contact person: <br />Bob Leonard <br /> <br />Phone number: <br />425-257-8335 <br /> <br />Email: <br />bleonard@everettwa.gov <br />Initialed by: <br />RML <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />On April 24, 2024, City Council adopted a funding Ordinance to fund the design and engineering <br />for the proposed repairs to three floating docks in the amount of $40,000. This proposed <br />Ordinance will provide an additional $100,000 which will include all costs related for the repairs <br />and construction costs in the amount of $140,000. The source of funds for this project is Fund <br />354, Program 100 (CIP 3). <br /> <br />Project summary statement: <br />Thornton A. Sullivan Park at Silver Lake is one of City of Everett’s most beloved parks and has <br />been a hub of water-based activities for generations of park users. The shoreline and beach serve <br />as major year-round attractions. Three floating docks are an integral feature of beach activity, <br />serving organized programming and the general public. At well-over thirty years old the floating <br />docks are long-overdue for deferred maintenance. Parks and Facilities will undertake the first <br />major renovation of the docks as an interim solution to a longer-term vision for a new state-of <br />the-art pier/dock system that meets current ecological and design standards. <br />Based on a preliminary assessment and recommendation engineers report conducted December <br />2023, needed repairs include: resurfacing to remedy significant spalling and delamination of the <br />concrete surfaces that pose trip hazards and render the docks non-ADA compliant; replacement <br />of rotting bull rails, perimeter walers and edge/rub boards; replacement of missing through-rods <br />connecting and stabilizing float sections; pin pile replacement; mooring system upgrades; shore <br />re-grading where the docks and access gangways meet the beach to minimize grounding and <br />excessive lateral pitch of the docks. <br /> <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance amending Ordinance No. 4019-24 Entitled a Special Improvement Project <br />Entitled “Thornton A. Sullivan Park Floating Dock Repairs”, Fund 354, Program 100, to <br />accumulate all costs for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.