Laserfiche WebLink
CUST:Everett Transit BUS #:DATE:1/30/2025 <br />VIN #:XXXXXXXXXXX179622 MODEL:2011 Gillig 35' Diesel LF <br />ITEM #LOCATION OF DAMAGE DESCRIPTION QTY UOM PART #COST EA EXT COST LABOR HRS <br />Everett Transit Bus Purchase Add-Ons EuroWindow (7 Buses) <br />01.02 Part for Line 01 Shock, Absorber, Front, Monroe # <br />74414 | Gabriel 85723 <br />2.00 EACH 08-73701-000 182.32 364.64 <br />02 Rear Suspension Customer Requested Replacement <br />of Air Bags and Shocks / Remove <br />and Replace Rear Axle Air Bags and <br />Shocks <br />-X-0.00 0.00 20.00 <br />02.01 Part for Line 02 Air Spring / Air Bag, Rear, <br />Firestone# W01-358-9697 <br />4.00 EACH 82-60271-000 148.29 593.17 <br />02.02 Part for Line 02 Absorber, Shock, RR 4.00 EACH 11-73703-000 160.08 640.32 <br />03 Wheels and Tires Customer Requested Wheels be <br />Replaced with New / Remove Tires <br />from Existing Rims and Install on <br />New Rims <br />-X-0.00 0.00 6.00 <br />03.01 Sublet for Line 03 Sublet, Remove and Install Tires on <br />New Rims <br />1.00 EACH Sublet 226.67 0.00 <br />03.02 Part for Line 03 Wheels, Disc Hub Piloted, Steel 6.00 EACH 53-16097-001 328.65 1,971.92 <br />05 - Paint & Decals <br />01 Bus Exterior Paint Bus to Match Everett Transit <br />Fleet Scheme (Red Above Belt Line, <br />Black Window Panels and Entrance <br />and Exit Door Panels, Silver Below <br />Belt Line) See Drawing <br />-X-0.00 0.00 12.00 <br />01.01 Sublet for Line 01 Sublet of Painting Bus 1.00 EACH Sublet 37,200.00 0.00 <br />02 Bus Exterior Install Decals to Match Customer <br />Supplied Scheme <br />-X-0.00 0.00 0.00 <br />02.01 Parts for Line 01 Kit, Decals Everett Wings Branding 1.00 EACH Decals 2,933.33 2,933.33 <br />02.02 Sublet for Line 02 Sublet Installation of Graphics 1.00 EACH Sublet 2,000.00 0.00 <br />622.0077,750.00TOTAL LABOR COST <br />174,119.48TOTAL PARTS COST <br />0.00TAX @ <br />299,160.15TOTAL <br />APPROVED BY CCW: <br />APPROVED BY CUSTOMER: <br />DATE <br />DATE 0.00TRANSPORTATION <br />47,290.67OTHER