Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit#: PW2212-010 Additional Notes: <br /> Project Address: 7826 Rainier Dr Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: Paved parking and walkway for new DADU calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett 1.� <br /> Sewer District: Everett Prepared By! TKJ Date: 12/14/2022 <br /> Outside City Limits? No *Adds a 25%Surcharge j__ <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed BQ ip ,..---L,-- \ Date: 1 21 13'I tit- <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> • Permit#: BXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PW2212-010 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 270 SF <br /> Stormwater System Dev Fee: $72.31 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />