Laserfiche WebLink
• <br /> Cindy Bergsma <br /> From: Vlad Sirbu <sysarchitecture@gmail.com> <br /> Sent: Saturday, February 4, 2023 9:05 PM <br /> To: Cindy Bergsma <br /> Subject: [EXTERNAL] Fwd: B2204-011 7826 RAINIER DR <br /> Attachments: Bojica AFH - FLOOR + EXIT PLAN.pdf <br /> Follow Up Flag: Follow up <br /> Flag Status: Flagged <br /> CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you <br /> recognize the sender and know the content is safe. <br /> Cindy, <br /> The owner forwarded me your email from January 26th about permit B2204-011 for the Adult Family Home. <br /> They would like to keep this active and move forward with the AFH application if possible. <br /> We are in the review process for the ADU and Remodel of the residence, to bring everything into compliance and <br /> permitted, but while that is in process or review, they were wondering if they could move the AFH and WABO inspection <br /> moving along and have asked me to generate the attached AFH floor plan and AFH Emergency Exit Plan, which would go <br /> along with the WABO inspection checklist. <br /> Please let me know what our next steps could be. <br /> Thank you very much. <br /> Vlad Sirbu, Architect <br /> SVS Architecture LLC <br /> (425) 442-3412 <br /> Forwarded message <br /> From: daniela bojica <sorinsjanitorial@yahoo.com> <br /> Date: Sun,Jan 29, 2023 at 8:47 PM <br /> Subject: Fwd: B2204-011 7826 RAINIER DR <br /> To: <SVSarchitecture@gmail.com> <br /> Sent from my iPhone <br /> Begin forwarded message: <br /> From: Cindy Bergsma <CBergsma@everettwa.gov> <br /> Date:January 26, 2023 at 3:22:45 PM PST <br /> 1 <br />