My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5117 27TH AVE W 2025-05-29
>
Address Records
>
27TH AVE W
>
5117
>
5117 27TH AVE W 2025-05-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 3:00:26 PM
Creation date
3/13/2025 2:28:32 PM
Metadata
Fields
Template:
Address Document
Street Name
27TH AVE W
Street Number
5117
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 of 29 <br /> A PROJECT NO. SHEET NO.I PA S211026-4XR <br /> 4.41%.�* PROJECT 5117 27TH AVE W , EVERETT, WA 98203 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY' FY 05/10/2022 <br /> ENGINEERING&DESIGN BY DATE <br /> ScopelObjective: <br /> To determine the required pile spacing and geometry to stabilize and lift(where required)the existing structural foundation. These <br /> findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the <br /> existing structure above(based on as-built assessments). <br /> The R&R Foundation Specialists'(R&R)proposed pile layout can be found in the following pages with structural recommendations <br /> based upon the findings of L120 Engineering&Design. <br /> Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic <br /> damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included <br /> in the structural scope presented here. <br /> It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings.The interior crawl-space <br /> support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support <br /> posts,adjustable post-base hardware,and/or the addition of taller wood support members. Settlement in these interior support <br /> areas shall be monitored and further adjustments shall be made if necessary. <br /> Structural Summary: <br /> -The foundation of the residence consists of continuous cast-in-place concrete stem wall and concrete strip footings.Below the <br /> footings,piles are to be spaced at a distance no larger than 7'-0"on-center at the locations indicated on the attached Level Survey. <br /> Piles to be installed in accordance with SSK-01, SSK-02,and SSK-03. <br /> - End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance as per plan. <br /> -A maximum allowable loading of 1,835 plf was utilized in this analysis.This was determined through inspection of building <br /> geometry and conservative span/tributary loading assumptions based on standard construction practices <br /> - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and <br /> equipment assemblies with capacities equal to or greater than the indicated load values. <br /> Allowable Load Capacity Requirement: <br /> Typical Helical Pile @ 7'-0"Max: 13.0 kip minimum vertical capacity(allowable load) <br /> Typical Concentric Pile: 12.0 kip minimum vertical capacity(allowable load) <br /> Note: Refer to the attached General Notes for additional requirements. <br /> - As determined by R&R,the site appears to have no lateral(horizontal)displacements or concerns. As such,the analysis and <br /> recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed <br /> or expected additional structural analysis will be required. <br /> Structural recommendations contained in this package are based on site photographs,dated September 30,2021, provided by R&R. <br /> To the knowledge of L120,a geotechnical investigation was not performed on this site.Consequently,all structural <br /> recommendations assume adequate soil conditions to obtain the required pile capacities. <br /> Please inform L120 of site-specific conditions that were unconsidered by, may conflict with,or otherwise compromise the <br /> recommendations contained within this package, including, but not limited to,water drainage,slope stability,existing structural <br /> damage,or existing subsurface obstructions. In this instance,the structural assumptions, recommendations,and scope for this <br /> project will need to be revisited to consider and address the new findings <br /> Refer to the following pages for pile and connection specifications. <br /> L120 ENGINEERING&DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.