My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5117 27TH AVE W 2025-05-29
>
Address Records
>
27TH AVE W
>
5117
>
5117 27TH AVE W 2025-05-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 3:00:26 PM
Creation date
3/13/2025 2:28:32 PM
Metadata
Fields
Template:
Address Document
Street Name
27TH AVE W
Street Number
5117
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 of 6 <br /> LONGITUDE <br /> ONE TWENTYO <br /> ENGINEERING&DESIGN <br /> Helical Pile Review for Structural Compliance <br /> Date: February 5, 2024 <br /> Project Name: 5117 23rd Ave W- Foundation Stabilization Effort L120 Project#S230130-2XR <br /> Project Location: 5117 23rd Ave W, Everett,WA 98203 <br /> Client's Name:JJ Montoya, Project Coordinator—R&R Foundation Specialist, LLC <br /> To whom it may concern, <br /> The purpose of this letter is to confirm helical pile installation and capacity compliance with the structural <br /> requirements specified in the L120 Structural Calculation Package and Structural Site&Foundation Plan dated <br /> March 17, 2023. <br /> On September 5-7, 2023,the installation of eight(8) helical piles to stabilize areas of the residence located at 5117 <br /> 23rd Ave W were finalized by R&R Foundation Specialists (R&R).The FOR from L120 Engineering and Design was <br /> present on site during the pile installation. Piles were installed with a DIGGA 10k drive head to a maximum depth <br /> of 5ft and were installed by R&R certified installers in accordance with the cited structural package and ESR-3750. <br /> Please refer to the attached drive log. <br /> With pile spacing at a maximum 6'-0"on-center,the minimum required vertical capacity as determined by L120 <br /> was allowable loadings of 14 kips per pile.These demand requirements are as determined and specified in L120's <br /> structural calculation package cited above. <br /> As required by the referenced structural package, proof testing was performed to 200 percent of the specified <br /> design load.The installers utilized the dead weight of the existing structure to achieve the required reaction of the <br /> test piles. <br /> Pile capacities for helical piles have been calculated utilizing the torque correlation factors provided in ESR-3750.A <br /> torque/capacity chart detailing this calculation has been attached to this letter. Per the attached document,an <br /> Ideal Foundation Systems 2-7/8in diameter 10k helical pile installed to minimum pressures of 1,200psi results in an <br /> installation torque of 4,176 ft-lbs,and an allowable capacity of 18.8 kips including a safety factor of 2. <br /> The results are summarized below: <br /> Maximum Demand (allowable)= 14.0 kips/pile <br /> Available Capacity(allowable) = 18.8 kips/pile <br /> 0. ••• 0B <br /> LUOEngineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.