• <br /> December 20,2021 <br /> Page 3 of 4 <br /> Limited Geotechnical Evaluation <br /> Monitoring installation torque in the field is used to estimate the anchor compression capacity, <br /> and also as a quality control during anchor installation, provided that the anchor is bearing in <br /> dense or hard soils. Dependent on the pile size and the equipment used to install the anchors,an <br /> empirical factor is multiplied by the average torque over the final 3 feet of installation to estimate <br /> ultimate capacity. <br /> Allowable Helical Pier Compression Capacity Pa may be estimated from the following equation <br /> provided that the pier is in the recommended bearing soils: <br /> Pa=Kt x T/FoS, <br /> Where T is the applied torque, Kt is the empirical ratio factor. The following industry standards <br /> apply to shafts with blades spaced along the shaft at 2.5 to 3.5 times the average blade diameter <br /> on-center and meeting the manufacturer's specifications. <br /> 1.5"and 1.75"Square Shafts - Kt=9 ft-i <br /> 2.875"O.D.Round Shafts - Kt=9 ft-i <br /> 3.o"O.D.Round Shafts - Kt=8 ft-i <br /> 3.5"O.D.Round Shafts - Kt=7 ft-i <br /> Proof testing of at least twenty percent of the helical piers in eight equal increments up to 200 <br /> percent of the design load,if required by the permitting authority. Each load increment up to the <br /> 200 percent of design load should be held for five(5)minutes and the vertical strain monitored.If <br /> the total strain between 1 and 5 minutes is less than o.04 inches, the helical pier may be <br /> considered acceptable.If the recorded strain exceeds o.04 inches,the helical pier should either be <br /> deepened and retested or abandoned and a new helical pier shall be installed and tested. <br /> Driven Piles <br /> We understand that 2-7/8 inch piles may be used to support portions of the structure. These piles <br /> will likely be advanced using a double-cylinder hydraulic system. <br /> Piles should be advanced until working pressures are achieved that provide the specific minimum <br /> capacities with a factor of safety of at least 2. Work will be halted if the structure experiences <br /> uplift flexure. The working pressure for a 3.5 inch cylinder bore is 2,50o pounds per square inch <br /> (psi),and 2,000 psi for a 4 inch diameter cylinder bore. <br /> The required pile length in order to develop the recommended pile capacity is expected to vary <br /> depending on the depth of dense to very dense soils below the residence. We estimate pile lengths <br /> of 7 to 15 feet below foundation grades,with a likely average of about io feet. <br /> A total of 3 percent of the piles (one pile minimum) should be load tested to verify the design <br /> capacities.All load tests shall be performed in accordance with the procedure outlined in ASTM <br /> be 2 times the designload. Load testingmayneed to be <br /> Dii . The maximum test loadshall <br /> 43 <br /> terminated if additional lifting of the structure occurs. <br /> A representative of the geotechnical engineer shall provide full time observation of pile <br /> installation and testing to verify the driving refusal criteria if required by the permitting authority. <br /> www.cobaltgeo.com (206)331-1o97 <br /> 3IB <br />