My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6600 EVERGREEN WAY LUNA MEXICAN GRILL 2025-04-28
>
Address Records
>
EVERGREEN WAY
>
6600
>
LUNA MEXICAN GRILL
>
6600 EVERGREEN WAY LUNA MEXICAN GRILL 2025-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 11:23:30 AM
Creation date
3/14/2025 1:01:39 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6600
Tenant Name
LUNA MEXICAN GRILL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 2—Automatic Functional Test: PASS FAIL N/A <br /> 1. Reset System -The contractor shall reset the system and ensure that the ❑ ❑ ❑ <br /> equipment under the hood is on and power/gas is being supplied. <br /> 2. Activate Fusible Link- Initiate the automatic functional test by having the ❑ ❑ ❑ <br /> contractor activate the most remote fusible link or detector. <br /> 3. Fire Alarm Activation- If the building is equipped with a fire alarm system, did the ❑ ❑ ❑ <br /> activation of the system activate local notification device/bell and activate an <br /> alarm signal (clearly illustrating the type and location of alarm) at the fire alarm <br /> panel? <br /> 4. Power& Fuel Shutdown - Did the activation of the system shut down power and ❑ ❑ ❑ <br /> fuel supply to ALL equipment protected under the hood and the makeup air <br /> suppling the hood? Does it have to be manually reset after system activation? <br /> 5. Exhaust Fan- Did the activation of the system turn on or keep on the exhaust fan ❑ ❑ ❑ <br /> and did they continue to operate during and after then system discharge? <br /> 6. Visual Indicator- Did the visual indicator on the control head illustrate that the ❑ ❑ ❑ <br /> system has operated? <br /> Returning System to Operational Condition <br /> PASS FAIL N/A <br /> 1. Operational Conditions-After completion of all functional testing,the following ❑ ❑ ❑ <br /> shall be done to return the system to operational conditions: <br /> • Each agent tank shall be reconnected. <br /> • All power/gas has been restored. <br /> • If the system is connected to an alarm,the alarm shall be taken off test. <br /> • All cooking equipment shall be in its approved locations. <br /> • All grease filters shall be installed. <br /> • The contractor verifies that the system is fully operational. <br /> 2. NFPA 17 Report- Prior to final approval the installing contractor shall complete, ❑ ❑ ❑ <br /> sign, and provide a copy of the NFPA 17A acceptance test report. <br /> Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire INFORMATION HANDOUT C-10 4.29.2020 I Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.