My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
928 HOYT AVE 2025-04-15
>
Address Records
>
HOYT AVE
>
928
>
928 HOYT AVE 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:56:33 AM
Creation date
3/14/2025 1:31:26 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
928
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT# .V 7i3o ( ` 0 U7 <br /> BUILDING • LANNING <br /> �Intake OK by: Qk Date: k ,2.42023 Intake OK by: /'/f/(7 Assign To:44 Date: 2—/q12- 3 <br /> Intake Comments: Intake Comments: <br /> Zone <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> i Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No. of Dwelling Units: <br /> Bldg/T/Add?Rem Size S F Total No.of Dwelling Units: <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories I "In Lieu"Fee: Type: Amount$ <br /> Basement ❑No ihYes ,6T9 Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group DEverett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: El Update Existing ONew System ENot Req'd Park Impact Fee Total$ (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing El New System CatJot Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC79.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add!RCW 64.55 docs required prior to final? DYes INo 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ 20 C7 Additional Notes: <br /> Approved By:66, Date: 3 /1 / )Z. <br /> • PUBLIC WORKS ` <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: PW Worksheet Needed if: <br /> ❑Sys Dev Eval(Util/SW)❑Traffic Mit Eval <br /> Approved By: ?P°(-k, Date: \/2bf-ZB-2 ❑Site Work/Drainage DAddress Letter <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate I Deferred Submittals Required: DRoute this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept.Fees: 0 See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#:PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND 0 Is located in this folder <br /> ADD FIRE FEE El in a Separate Green Folder Qoin with this folder for permit issuance) <br /> El Review/Inspection Scope <br /> Approved By: Date: ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ❑ Public Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.