My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6313 WETMORE AVE 2025-04-18
>
Address Records
>
WETMORE AVE
>
6313
>
6313 WETMORE AVE 2025-04-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2025 9:25:23 AM
Creation date
3/14/2025 2:40:40 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
6313
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 8/17/2023 8/17/2023 BLDG 07-EXTERIOR I Matt Schreifels APPROVAL eTRAKiT Inspection Request <br /> SHEAR <br /> Notes: <br /> 8/14/2023 4:56 PM JNR CONSTRUCTION <br /> Contact Name:JNR CONSTRUCTION <br /> Site Address:6313 WETMORE AVE <br /> Phone:2062711856 <br /> e-Mail:joe@jnrconstruction.org <br /> 8/17/2023 8/17/2023 BLDG 08-FRAMING Matt Schreifels NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 8/14/2023 4:57 PM JNR CONSTRUCTION <br /> Contact Name:JNR CONSTRUCTION <br /> Site Address:6313 WETMORE AVE <br /> Phone:2062711856 <br /> e-Mail:joe@jnrconstruction.org <br /> 8/17/2023 8/17/2023 BLDG 14-ROOF <br /> NAILING Matt Schreifels APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 8/14/2023 4:58 PM JNR CONSTRUCTION <br /> Contact Name:JNR CONSTRUCTION <br /> Site Address:6313 WETMORE AVE <br /> Phone:2062711856 <br /> e-Mail:joe@jnrconstruction.org <br /> 12/4/2023 12/4/2023 BLDG 08-FRAMING Matt Schreifels CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 11/30/2023 9:53 PM JNR CONSTRUCTION <br /> Contact Name:JNR CONSTRUCTION <br /> Site Address:6313 WETMORE AVE <br /> Phone:2062711856 <br /> e-Mail:joe@jnrconstruction.org <br /> 1. Install gable end bracing per approved plans <br /> 2.Revise stair layout per the 2018 IRC Section R311.7 <br /> Additional notes: <br /> Reschedule for framing inspection once items have been addressed <br /> If insulation&drywall is to be installed Required building inspections include: <br /> 1. Fire Stopping/blocking <br /> 2.Insulation inspection <br /> 3.Drywall Nailing inspection. <br /> Prior to building final,final approval on all sub-permits(i.e.Electrical permit)is required. <br /> Contact Public Works inspector for requirements regarding skirting/driveway to alley way @ 425-257-8810 option 4(for inspectors)&option 4(for <br /> Public Works inspector)prior to requesting building final. <br /> I <br /> Printed:Wednesday, 18 September, 2024 2 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.