My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE PENSKE 2025-04-09
>
Address Records
>
RAILWAY AVE
>
2410
>
PENSKE
>
2410 RAILWAY AVE PENSKE 2025-04-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 11:58:11 AM
Creation date
3/14/2025 3:02:40 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Tenant Name
PENSKE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 1/18/2024 1/18/2024 BLDG 16-FINAL Matt Schreifels CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 1/16/2024 10:19 AM Natalie Dorn <br /> Theoren Ryan for inspection can be reached at 803-542-4802;will have multiple inspections scheduled for 3 sites including 5505 Evergreen and 1101 <br /> Industry <br /> Contact Name:Natalie Dorn <br /> Site Address:2410 RAILWAY AVE <br /> Phone:8039042004 <br /> e-Mail:ndorn@amarok.com <br /> Upload stamped letter from Engineer of Record for the fiberglass posts and the solar stations that they were installed per approved plans and/or are <br /> structurally adequate as installed. <br /> 6/26/2024 6/26/2024 BLDG 02- Matt Schreifels CORRECTION See notes <br /> FOOTING/SETBACK REQUIRED <br /> Notes: <br /> 6/25/2024 7:50 AM Natalie Dorn <br /> Gia Moore is contact for footing inspection-803-904-2410 <br /> Contact Name:Natalie Dorn <br /> Site Address:2410 RAILWAY AVE <br /> Phone:8039042004 <br /> e-Mail:ndorn@amarok.com <br /> Unable to perform the inspection today as there were no City of Everett approved plans on site.Approve plans must be on site at all times during <br /> construction. Reschedule for putting setback inspection once plans are available.Do not place concrete until inspection has been approved.Contact <br /> building inspector between 730 and 8:30 AM with questions or ETA on day of inspection <br /> 7/2/2024 7/2/2024 BLDG 02 FOOTING/SETBACK Matt Schreifels PARTIAL APPROVAL see notes for approval/restrictions <br /> Notes: <br /> 6/26/2024 2:05 PM Natalie Dorn <br /> Gia is on site contact for inspection 803-904-2410 <br /> Contact Name:Natalie Dorn <br /> Site Address:2410 RAILWAY AVE <br /> Phone:8039042004 <br /> e-Mail:ndorn@amarok.com <br /> OK to place concrete for the south west solar array and north east solar array.The north solar array and south east solar arrays still need inspections for <br /> concrete footings. <br /> 7/16/2024 7/16/2024 BLDG 02- Matt Schreifels APPROVAL ok to place concrete <br /> FOOTING/SETBACK <br /> Notes: <br /> 7/12/2024 8:32 AM Natalie Dorn <br /> Contact for inspection will be Gia Moore 803-904-2410 <br /> Contact Name:Natalie Dorn <br /> Site Address:2410 RAILWAY AVE <br /> Phone:8099042004 <br /> e-Mail:ndorn@amarok.com <br /> I <br /> Printed: Friday, 16 August,2024 3 of 4 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.