Laserfiche WebLink
Otak <br /> ii► <br /> Otak Architects,Inc. <br /> 808 SW Third Avenue,Suite 300 <br /> Portland,OR 97204 <br /> main 503.287.6825 <br /> www.otak.com <br /> 0 . <br /> 1 'i c. <br /> 4 o <br /> •♦♦♦♦♦♦♦♦♦♦ �i1 RIM=43860 q� <br /> ♦:♦♦♦♦♦♦♦ :♦:♦:♦fir. ,••j <br /> 22 <br /> f 4. <br /> II <br /> I <br /> II <br /> I <br /> i © mP) I <br /> co <br /> °'I <br /> ♦♦♦♦♦♦♦♦♦♦♦ ♦♦ , I CONSULTANT <br /> ♦♦♦♦♦♦♦♦�♦♦♦♦:, <br /> Cl)v,^ <br /> ♦' 2 o I Z <br /> o <br /> ♦. I W <br /> 2 <br /> ., <br /> I <br /> ::LLANO„i <br /> i ) I W <br /> Hlht=44i 13 A .411 A I <br /> N N I m 0 <br /> I D (TPI <br /> 4-4 <br /> ►� (Al <br /> ♦• 1 /Ce <br /> ��� A ♦ A I _ V <br /> ♦♦♦♦y9` is• <br /> i Z <br /> Oi♦i♦i ♦ 1 El <br /> ♦♦♦♦♦♦♦ ♦' I 0 <br /> c,E,r,;rp T ♦♦♦♦♦♦♦♦ A EXISTING ID-INCH PCCP '♦' 4, <br /> CT.:-44^,40 ��♦♦♦♦♦♦♦♦♦♦��♦ O) .: O7 1 <br /> �♦ I <br /> in CLEANOUT -. .I., �; -'I1 CCIZ <br /> ♦• A ►� — .4I — a. <br /> . co Z <br /> ♦, ♦, I illHIM=43.44 Q O <br /> m'(TYP.) is ..; 4'Pvc 1 1 as I Q —I♦' Q I <br /> 0El <br /> ♦ o O <br /> <x"' �♦• ,�� I W O W <br /> a <br /> ,,c1 i <br /> 4 P V IY o <br /> b s � 7�Z 177�1Z�� L i CATCH BASIN ss Q <br /> ILY l RIM=433 i. Q <br /> kt <br /> !1i6S-RUCTED C <br /> Ufll <br /> -6 Ut <br /> E I Z <br /> z IX F Q <br /> I Et =Lu U <br /> 3 MATCHLINE SEE SHEET C1.02 W o W C/) <br /> �w I-M LU <br /> 9 <br /> O <br /> TITLE <br /> U TESC& DEMOLITION NOTES GENERAL NOTES LEGEND DATE DESCRIPTION <br /> 8232021 PERMIT <br /> 6 0 REMOVE EXISTING TREE. 14 REMOVE EXISTING ECOLOGY BLOCK. 1. EXISTING TWO STORY BUILDING TO REMAIN.PROTECT 1212022 BID ISSUE <br /> U DURING CONSTRUCTION. — CLEARING AND GRUBBING <br /> 00 REMOVE EXISTING WALL. 15 SEE DETAIL 2 ON SHEET G4.01 FOR REMOVAL OF EXISTING MODULAR BUILDINGS <br /> cQ❑a <br /> i REMOVE EXISTING TRAFFIC CURB. AND DEMOLITION OF CONNECTING STRUCTURES. 2. NSEE OTES. PAVEMENT <br /> C0.02 FOR CITY OF EVERETT STANDARD PAVEMENT REMOVAL <br /> INSTALL TEMPORARY CHAINLINK FENCE PER DETAIL 11 ON SHEET C7.01. <br /> sao a REMOVE EXISTING CONCRETE SIDEWALK. 16 3. STORM DRAIN INLET PROTECTION SHALL BE PROVIDED <br /> n aINSTALL STRAW WATTLE PER WSDOT STD PLAN 1-30.30-02 WITH SANDBAG PLACED AND MAINTAINED AT ALL EXISTING AND PROPOSED SAWCUT <br /> c a REMOVE EXISTING PAINT LINE. ON TOP TO SECURE THE WATTLE. STORM INLET PRIOR TO AND FOR THE DURATION OF <br /> CONSTRUCTION OPERATIONS.PROPOSED CATCH BASINS o TREE PROTECTION <br /> SAWCUT AND REMOVE EXISTING PAVEMENT.APPROX.LIMITS PER PLAN. 3INSTALL STORM DRAIN INLET PROTECTION PER COE STD DETAIL 210. AND PROTECTION MEASURE NOT SHOWN IN PLAN FOR X TREE REMOVAL REVISIONS <br /> MS,BS,AL,EH MDC <br /> 7❑ SALVAGE EXISTING LECTRI A AND POLE,DEMOLISH POLE 18 REMOVE EXISTING WHEEL STOP. X TEMPORARY CHAINLINK FENCE DRAWN BY CHECK BY <br /> ?-. FOUNDATION.SEE ELECTRICAL PLAN FOR DETAILS. 4. ALL EXISTING LANDSCAPE BOULDERS(NOT SHOWN)TO <br /> x 20 REMOVE AND SALVAGE EXISTING SIGN. BE SALVAGED FOR RELOCATION ON-SITE.REFER TO BID ISSUE <br /> B0 EXISTING CONCRETE SIDEWALK TO REMAIN,PROTECT DURING PLANTING PLANS FOR RELOCATED BOULDER LOCATIONS. STATUS <br /> STRAW WATTLE <br /> STATUS <br /> CONSTRUCTION. IIII----21----LLLL REMOVE EXISTING DUMPSTER AND TRASH ENCLOSURE <br /> 9a PROTECT EXISTING TREE PER DETAIL 3 ON SHEET L2.10. RELOCATE EXISTING LIGHT AND SIGNAL POLE.SEE SHEET G4.01 FOR NEW S. PARE APPROXIMATE.AVEMENT REMOVAL SAWCUT THE CONCRETE D SAWCUTTING LIMIT SHOWN STORM DRAIN INLET PROTECTION 1212022 <br /> Eill DATE <br /> _ LOCATION. PAVEMENT FOR LANDSCAPING,REMOVE THE PAVEMENT 32880J <br /> 10 EXISTING UTILITY TO REMAIN,PROTECT DURING CONSTRUCTION. UP TO 6'BEHIND THE PROPOSED BACK OF CONCRETE <br /> 184 23 EXISTING RAILING TO REMAIN,PROTECT DURING CONSTRUCTION. CURB LINE. PROJECTROJE NUMBER <br /> o 11 CONSTRUCTION. <br /> ON LINK FENCE TO REMAIN,PROTECT DURING 24 EXISTING MONUMENT SIGN TO BE REMOVED AND RELOCATED ON-SITE. 6. BMP 75.13 POST-CONSTRUCTION SOIL QUALITY AND • V 1 a O 1 <br /> DEPTH SHALL BE APPLIED FOR SOIL PREPARATION. <br /> 12 EXISTING CURB TO REMAIN,PROTECT DURING CONSTRUCTION. 26 REMOVE EXISTING STONE BENCHES AND FLAGSTONE PATH. CONTRACTOR SHALL PRIORITIZE THE REUSE OF EXISTING <br /> Know Woes below. aEXISTING SIGN TO BE REFURBISHED PER DETAIL 2 REFERENCE ED1.01 FOR DEMO OF ELECTRICAL SERVICE TO MODULAR BUILDINGS. TOPSOIL,PER CITY OF EVERETT REQUIREMENTS.(COESTANDARD PLAN 202 AND 203) 20 0 20 40 el 20210TAK.INC. <br /> '$ ON SHEET L1.04. <br /> CBI)before you dig. 0 EXISTING SIGN TO REMAIN. HORZ mmle drawing is not 2r,S.d has been <br /> a SCALE IN FEET redoced,enI,,8ed.Scale accordingly. <br />