Laserfiche WebLink
MATCHLINE SEE SHEET C3.01 Otak <br /> L=15.7 O r L=5.5' L=5.5' 4 • �I, <br /> R=25.0' P4 R=3.5' 0 (TYP) R=3.60 <br /> A=36.0° P5 A=90.0° \ Q © e=90.0• _ <br /> r pg 04 co I1R3 / 0 Otak Architects,Inc. <br /> L=9.5' 1 / 0 Q CONSTRUCTION NOTES 808 SW Third Avenue, <br /> OR 97204 <br /> R=72.0' P11 �Pi Qi, 02 Rt I-II.R2 ---- - -- -- -- main 503.287.6825 <br /> ji <br /> A�5.5' - - r I ,•,i _h sway otak corn <br /> P13 -, , <br /> of HMA PAVEMENT RESTORATION PER DETAILS ON SHEET <br /> �I 3.9' 4.OI C7.01. <br /> 0 O 'i I p CONSTRUCT CEMENT CONC.PAVEMENT RESTORATION b D c �7 <br /> L=2.6 , P9:_,;.;-P10 I PER DETAILS ON SHEET C7.01. Q• ♦o• '/ <br /> s <br /> �y1B2• P14A. <br /> I py� { I ao - r- -i " O CONSTRUCT CEMENT CONC.SIDEWALK PER DETAILS 9 4� <br /> PB e • A ON SHEET C7.01. ''a <br /> L=7.6 I r -/:_,.:::. I Q I i - 29w:♦° <br /> N6 NS R0.0' p6 P7 ••• j • • 4(4 CONSTRUCT CEMENT CONC.EXTRUDED CURB PER vs. '�Z2 <br /> e�7.5' II P26 I - DETAILS ON SHEET C7.01. <br /> N4 L=2.4'L T 1T' ' J SEE SHEET C3.03 AND C3.04 FOR 0 4.' : l a l 1 I°I I ... <br /> R=t.5 •24 L=7.9' PLAZA AND SIDEWALK GRADING -"- , „ EVERETT STANDARD DETAIL 309(TYPE E-1). <br /> J N3 A J0.0' R t2.0 R=5.0' SO CONSTRUCT CEMENT CONC.CURB PER-i). OF <br /> A03.7° a=90.0` <br /> Ni N2 R=507.3' ® I .y O CONSTRUCT CEMENT CONC.RAMP PER GRADING DETAIL sTnlla <br /> R=5.0' SEE SHEET 0 I___ _.- . ON SHEET C3.03•C3.04. <br /> A 84.1° L1.03 FOR <br /> DU FORTER O INSTALL DETECTABLE WARNING SURFACE,PER WSDOT <br /> 5. 0 111 <br /> STD PLAN F.45.10-03. <br /> ENCLOSURE O 11 <br /> OINSTALL REMOVABLE BOLLARD PER DETAIL ON SHEET <br /> WALL LAYOUT O °i C7.01. <br /> 00 Q <br /> 0 - 0 y `� 1 ;, O CONSTRUCT MONOLITHIC CEMENT CONCRETE CURB <br /> f AND SIDEWALK PER CITY OF EVERETT STANDARD <br /> EXISTING BUILDING DETAIL312' CONSULT „ <br /> 1/1 U6 V1 V6 Wt WB - - <br /> L=0.8' 70 INSTALL CONCRETE FILLED STEEL PIPE BOLLARD PER Cl)U2, U5 L0.8' V2,-'VS L-0 8' W2'_'W5 Q DETAIL ON SHEET C7.01. V`// <br /> L=0.8' U3 U4. L�.B' L=0.8' a o - • r R=0.5' ) R=05' a=90.1° I: : IV4 A=89.9° a <br /> t 11_ :;0 <br /> IICONSTRUCTCONCRETECONTROLJOINTPERDETAILON <br /> _ �• SHEET C7.01.-QI _= STAIRWAY PER DETAILAesse-so1 / AND SIDEWALK, 1 -, ON SHEET C3.03 AND C7.01. <br /> e=90.0• : 13 PLANE EXIST.ASPHALT PAVEMENT TO 2°DEPTH.HMA W <br /> Q. GRADING PLAN, OVERLAY TO THE FINISHED GRADE PER GRADING DETAIL /\ <br /> © L - ® SHEET C3.03 ON SHEET C3.03 AND C3.04. CO <br /> riCL <br /> M <br /> O a � <br /> '� . <br /> � .1V' <br /> 1 tzu a'°a,�I . Z <br /> O p 0 <br /> L B.3' <br /> O � � = = = = = fin LEGEND -1 <br /> R0.0' �y�M'� <br /> 01 \02 A=94.r Q CONCRETE PAVEMENT(PARKING) W <br /> 1 03 Z <br /> • <br /> AMA PAVEMENT RESTORATION(FULL DEPTH) <br /> 104 L ... .' _1 HMA PAVEMENT OVERLAY M <br /> CI Q <br /> n - ° CONCRETE SIDEWALK Y 0 <br /> __ W Z <br /> z <br /> MERRILL AND RING CREEK GENERAL NOTES Q <br /> CL <br /> mCo ' <br /> 1. ALL DIMENSIONS AND NORTHING AND EASTING U ce N o <br /> SITE LAYOUT POINTS SITE LAYOUT POINTS SITE LAYOUT POINTS SITE LAYOUT POINTS REFERENCES ARE TO FACE OF CURB,UNLESS Z CO Z <br /> o NOTED OTHERWISE. , 1Q <br /> POINT NORTHING EASTING ELEVATION DESCRIPTION POINT NORTHING FASTING ELEVATION DESCRIPTION POINT NORTHING FASTING ELEVATION DESCRIPTION POINT NORTHING FASTING ELEVATION DESCRIPTION ....I cn Q <br /> 2. ALL ELEVATIONS ARE TOP OF FLOWLINE PAVEMENT W> <br /> E P1 343584.40 1292809.18 438.97 BEGIN,MATCH EXIST. Q1 343E68.67 1292789.52 437.68 AP Ut 343560.77 1292918.13 438.57 BEGIN X1 343565.70 1292930.15 438.45 BEGIN OR FINISHED GRADE,UNLESS NOTED OTHERWISE. r R <br /> Z P2 343543.36 1292817.79 439.16 AP Q2 3431365.25 1292768.83 437.58 AP U2 343561.33 1292 dy <br /> 919.51 438.55 PC X2 343565.13 1292928.76 438.47 PC I.f Q I j Q <br /> Q <br /> 3 P3 343538.09 1292804.92 439.52 PC 03 343859.95 1292753.87 437.81 PC U3 343561.98 1292919.79 438.54 PT 23 343565.40 1292928.11 438.48 PT W CS' <br /> ;D' <br /> 1 P4 343529.19 12921304.22 439.61 FT 04 343653.36 1292756.57 437.91 PT U4 343569.42 12921316.75 438.48 PC X4 343572.86 1292925.06 438.40 PC r LLt 0 <br /> c HA RDESO P5 343525.67 1292810.01 439.61 PC U5 343569.69 1292916.09 438.46 PT X5 343573.52 1292925.33 436.39 PT <br /> V SITE LAYOUT POINTS <br /> N RD P6 343556.43 1292846.17 438.83 PT U6 343569.12 1292914.70 438.47 END X6 343574.09 1292926.73 438.38 END TITLE <br /> 8 P7 343564.58 129284286 438.61 pC POINT NORTHING EASTING ELEVATION DESCRIPTION a DATE DESCRIPTION <br /> a P8 343567.33 1292836.35 438.61 PT <br /> Rt 343787.99 1292724ae 436.01 AP SITE LAYOUT POINTS SITE LAYOUT POINTS 623rz021 PERMIT <br /> 1212022 BID ISSUE <br /> Fs P9 343562.44 129282428 438.61 AP R2 343774.58 1292722.09 435.91 AP POINT NORTHING FASTING ELEVATION DESCRIPTION POINT NORTHING EASTING ELEVATION DESCRIPTION <br /> SITE LAYOUT POINTS R3 343769.29 1292709.12 436.07 PC V1 343823.93 1292891.75 438.04 BEGIN Y1 343628.85 1292903.79 437.90 BEGIN <br /> 0 P10 343570.78 1292820.90 438.46 END,MATCH EXIST. <br /> °a POINT NORTHING EASTING ELEVATION DESCRIPTION R4 343762.68 1292711.82 436.17 PT V2 343624/19 /292893.81 438.02 PC Y2 343628.47 1292902.88 437.91 PC <br /> O P11 u' 2.12 1292125.07 439.57 PCC <br /> ro N1 343462.97 1292901.62 440.19 BEGIN P13 343526.40 129283329 439.42 PCC V3 343625.34 1292893.88 437.99 PT Y3 343628.75 129290221 437.90 PT <br /> N <br /> V N2 34347554 1292896.53 439.85 PC V4 343631.47 1292891.37 437.77 PC Y4 343634.86 1292899.71 437.66 PC <br /> c P14 343528.63 1292832.93 439.43 PT <br /> N3 343478.47 1292890.50 439.86 PT V5 343831.75 1292890.72 437.76 PT Y5 343635.51 1292899.99 437.64 PT REVISIONS <br /> 1 _ P17 343529.89 1292830.89 439.46 AP <br /> N4 34347829 1292869.87 439.87 PC P22 343546.07 1292840.84 439.19 AP 96 343630.99 1292888.87 437.78 END Y6 343635.89 1292900.91 437.62 END MS.85,AI_EH MDC <br /> DRAWN BY CHECK BY <br /> a N5 34347230 1292886A1 439.96 PT P24 343544.77 1292842.97 439.15 PC <br /> Y SITE LAYOUT POINTS SITE LAYOUT POINTS BID ISSUE <br /> NB 343459.39 1292889.55 440.07 END P26 343545.64 1292845.27 439.11 PCC STATUS <br /> tPOINT NORTHING EASTING ELEVATION DESCRIPTION POINT NORTHING EASTING ELEVATION DESCRIPTION 1212022 <br /> E SITE LAYOUT POINTS W1 343688.70 12928135.27 436.84 BEGIN Z1 343693.62 1292877.30 436.72 BEGIN <br /> DATE <br /> " POINT NORTHING EASTING ELEVATION DESCRIPTION w2 343689.46 1292867.12 436.82 PC zz 343&93.24 129287838 436.73 PC 32880J <br /> PROJECT NUMBER <br /> • <br /> 01 343520.65 1293643.27 438.88 BEGIN W3 343690.11 1292867.39 436.79 PT Z3 343693.52 1292875.72 436.71 PT /\�\,"_/•ll '//�J <br /> oN *,8411 <br /> ® 02 343536.70 1293036.76 438.50 PC W4 3436138.38 1292864.83 436.39 PC Z4 343699.75 1292873.17 436.31 PCVV=O!� <br /> tp" W5 343696.65 1292864.18 436.37 PT 25 343700.40 1292873.45 436.28 PT 03 343543.35 1293039.91 43829 PT <br /> Know What's below. 04 343547.59 1293053.45 438.44 END W6 343695.89 129286233 436.38 END Z6 343703.78 1292874.37 43627 END _ 20 20- --0 If thisa1ow p.INC Call before you dig. HORZ not 2a'•36.n has been <br /> a SCALE IN FEET reduced/enlarged.Scale according,/ <br />