Laserfiche WebLink
Otak <br /> Otak Architects,Inc. <br /> 808 SW Third Avenue,Suite 300 <br /> • FINISH GRADE FINISHED GRADE Portland,OR 24 <br /> main 8yv.03 v.287 olakco6825 <br /> 1"CLEAR,TYP. \ to K.com <br /> F=1TOP OF PAVING,CURB OR COBBLE EDGING <br /> 1Q DIAN VALVE BOX W/ THERMOPLASTIC,LOCKING 3 of JAWA Sh <br /> LVVCKI G LID �� QUICK COUPLER VALVE O�,N scytiti0 <br /> RUBBER COVER LABELED TWO PIECE BODY a.II r 1, I r ) y� FINISH GRADE/TOP OF MULCH �7-,Y �p �T.� b o <br /> .1�1/1(.�,,�,U 1�1,(.1,�1/1 a��,lAr aV(j(�l/d m <br /> F-1WITH"DO NOT DRINK" II <br /> EXTENSIONS(AS REQUIRED) ROUND PLASTIC VALVE o v 1�� POP-UP SPRAY OR ROTOR HEAD , 4 4 : <br /> STAINLESS STEEL BOX 6"DIA.X 8"DEEP 6� ' 'I' <br /> HOSE CLAMP COLOR:GREEN PVC SCH 80 NIPPLE Apr <br /> 3/4" HOSE <br /> DRAIN (2 REQUIRED) 1 (LENGTH AS REQUIRED) Fo�nnsen cg�4• <br /> VALVE W/LONG iris <br /> OPPER TRACE WIRE III I z ,,,2, <br /> KEY FOR SCH 40 PVC MAIN LINE L r#mFACTORY PRE-ASSEMBLED STAMP <br /> OPERATION SEE SCH 80 PVC ELL ORGRAVEL BACKFILL FOR <br /> SPECS) ( • �/ PVC TRIPLE SWING ASSEMBLY <br /> Ihi , TEE W/REDUCER DRAINAGE 6"MIN.LAYER � PVC SCH.80 I <br /> Illi!�iII�_O hill I.'U (4)SCH 80 3/4 "PVC III <br /> THREADED RISER <br /> ligEN BETWEEN LLS W/PVC NIPPLES FACTORY PRE-ASSEMBLED �*; •,��r <br /> PVC TRIPLE SWING ASSEMBLY PVC LATERAL PIPE <br /> OUTFALL PIPE TO <br /> LIIIIIIIIIIII <br /> PVC SCH 40 TEE '�„ <br /> RAIN GARDEN <br /> 1/2 CU YD OF MINERAL #4 REBAR(30"MIN.) <br /> AGGREGATE TYPE 4 OVER ay` PVC MAINLINE PVC SCH 40 TEE OR ELL CONSULTANT <br /> GEOTEXTILE FABRIC <br /> CO <br /> -- MANUAL DRAIN VALVE 2 QUICK COUPLER VALVE ASSEMBLY 3 POP-UP HEAD I— <br /> ® NOT TO SCALE L3.11 NOT TO SCALE L3.11 NOT TO SCALE <br /> FINISH GRADE WC <br /> NATIVE BACKFILL \ G <br /> =Ill COLOR:GR STANDARD VALVEWCOPPERTRECE WIRE COLOR:GREEN 0 <br /> (FROM VALVE TO END OF ZONE) #3 REBAR STAKE TO MARK SLEEVE _ EXTENSIONS(AS REQUIRED) <br /> (PAINT TOP SAFETY ORANGE) �y <br /> z z LINE SIZE PVC BALL VALVE Li <br /> IlLEM13 z LATERAL LINE a <br /> C PAVEMENT PVCCH 4B SSW_-----A--_Iri <br /> UNION <br /> G MAINLINE 1- BACKFILL AS SPECIFIED BRASS "CH 40 PVC <br /> c IRRIGATION WIRING w V <br /> CONTROL WIRE <br /> SPECIFIED PIPE BEDDING2X LU SCHED.40 P.V.C.SLEEVE \ r Z <br /> NOTES: <br /> SIZE ill ICI I■I■IIII■MENIN it I:L INE CINOTES: °EXTEND IRRIGATION SLEEVE 6" PVC ADAPTER r 3. 1 <br /> ASSEMBLY ` <br /> SNAKE ALL P.V.C.PIPING IN TRENCHING. WHERE ELECTRICAL WIRING DOES NOT BEYOND EACH SIDE OF PAVING. UNION J NOTES: *EXCEPT © POINT OF <br /> TIE LOOSE 3'LOOP IN ALL IRRIGATION SHARE COMMON TRENCH,OVEREXCAVATE MAINLINE OR "DEPTH OF MAINLINE=18 /I CONNECTION APPURTENANCES. <br /> WIRING AT CHANGES IN DIRECTION TRENCH 2"MIN.AND BACKFILL WITH LATERAL PIPE 6"PEA GRAVEL USE TEFLON TAPE ON ALL m <br /> SPECIFIED BEDDING MATERIAL. a DEPTH OF LATERAL @ PAVING=14"MIN. <br /> GREATER THAN 30 DEG..UNTIE AFTER LOCATE ALL WIRING NOT IN COMMON THREADED FITTINGS. <br /> ALL CONNECTIONS HAVE BEEN MADE. TRENCHES ACCURATELY ON RECORD DWGS.. =DEPTH OF LINES UNDER DRIVING Z <br /> SURFACES=24"MIN. NOTE: <br /> BALL VALVE INSTALLATION UP FLOW FROM THE CROSS-CONNECTION CONTROL DEVICE SHALL <br /> RECEIVE ALL RIGID COPPER,TYPE L PIPE AND BRASS OR BRONZE FITTINGS AS REQUIRED. Cl <br /> TYPICAL TRENCHING IN LANDSCAPE AREAS 5 IRRIGATION SLEEVES UNDER PAVEMENT g BALL VALVE DETAIL <br /> L3.11 NOT TO SCALE L3.11 NOT TO SCALE L3.11 NOT TO SCALE Q <br /> "21 (),1, _1F III <br /> o MI0 Q <br /> Oo W <br /> U CKN 0 <br /> J <br /> o< O <br /> w� <br /> E Ce CI= Q <br /> ZCe iUi U <br /> #3 REBAR STAKE TO MARK SLEEVE Ill w E <br /> (PAINT TOP SAFETY ORANGE) G 1`W Q' <br /> i — <br /> PAVEMENT TITLE <br /> w BACKFILL AS SPECIFIED n DATE DESCRIPTION <br /> z CONTROL WIRE 623/2021 PERMIT <br /> W 1/21/2022 BID ISSUE <br /> 'oQLIJ SCHED.40 P.V.C.SLEEVE <br /> U 2X LINE SIZE <br /> oNOTES: <br /> °EXTEND IRRIGATION SLEEVE 6" <br /> BEYOND EACH SIDE OF PAVING. <br /> MAINLINE OR °DEPTH OF MAINLINE=24". <br /> LATERAL PIPE "DEPTH OF LATERAL @ PAVING=14"MIN. <br /> "DEPTH OF LINES UNDER DRIVING REVISIONS <br /> d SURFACES=24"MIN. MS BS,AL,EH MDC <br /> 2 DRAWN BY CHECK BY <br /> ` Y 7 IRRIGATION TRENCHING UNDER PAVEMENT BID <br /> STATUS <br /> L3.11 NOT TO SCALE <br /> O 1121/2022 <br /> DATE <br /> ROJE P <br /> sp <br /> O PROJECT NUMBER <br /> L3. 11 <br /> It° <br /> Know what's below. <br /> 52021 DTAK,INC. <br /> CCall before you dig. If this drawing is not 24".36-.it has been <br /> d reduced/enlarged.Scale accordingly. <br />