EROSION/SEDIMENTATION CONTROL NOTES STORM DRAINAGE NOTES SANITARY SEWER NOTES WATER DISTRIBUTION NOTES Otak
<br /> I. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL(ESC)PLAN DOES NOT 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED,CONCEALED,OR PUT 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT 1. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS %Al\ I
<br /> CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN(E.G. INTO USE UNTIL IT HAS BEEN INSPECTED,TESTED,AND ACCEPTED BY THE CRY OF STANDARDS AND WSDOT/APWA STANDARD SPECIFICATIONS. OF AN APPROVED BACKFLOW PREVENTION DEVICE PRIOR TO SATISFACTORY
<br /> SIZE AND LOCATION OF ROADS,PIPES,RESTRICTORS,CHANNELS,RETENTION EVERETT. FLUSHING,TESTING,DISINFECTION,AND RECEIPT OF SATISFACTORY Otak Architects,Inc.
<br /> FACILITIES,UTILITIES). 2. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED,CONCEALED OR BACTERIOLOGICAL TEST RESULTS. 808 SW Third Avenue,Suite 300
<br /> 2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND PUT INTO USE UNTIL IT HAS BEEN TESTED,INSPECTED,AND APPROVED BY THE Portland,OR 97204
<br /> 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE WSDOTIAPWA CITY INSPECTOR. 2. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND CITY OF EVERETT main 503.287.6825
<br /> MAINTENANCE,REPLACEMENT,AND UPGRADING OF THESE ESC FACILITIES IS THE STANDARD SPECIFICATIONS FOR ROAD,BRIDGE,AND MUNICIPAL CONSTRUCTION PUBLIC WORKS DEPARTMENT PRIOR TO THE CONNECTIONS TO AND TAPS ON www.otak.com
<br /> RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS (CURRENT EDITION). 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM EXISTING MAINS,AND INSTALLING THE Ply AND FDC.THE PUBLIC WORKS
<br /> COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE.THE CONTRACTOR DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE FOR EACH
<br /> 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID CONNECTION.THE PUBLIC WORKS DEPARTMENT SHALL THEREAFTER DETERMINE 03. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE.THE CONTRACTOR DAMAGE TO ANY ADDITIONAL UTILITIES NOT SHOWN.IF CONFLICTS WITH EXISTING THE DATE AND TIME AT WHICH THE CONNECTION SHALL BE MADE. 4"b C.
<br /> CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.DURING THE SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID UTILITIES ARISE DURING CONSTRUCTION,THE CONTRACTOR SHALL NOTIFY THE
<br /> CONSTRUCTION PERIOD,NO DISTURBANCE BEYOND THE FLAGGED CLEARING DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN.IF CONFLICTS WITH EXISTING PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED 3. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. - 'S!� 1
<br /> LIMITS SHALL BE PERMITTED.THE FLAGGING SHALL BE MAINTAINED BY THE UTILITIES ARISE DURING CONSTRUCTION,THE CONTRACTOR SHALL NOTIFY THE BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION it i-J;_Y'/ �
<br /> APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED ON THE PROJECT. 4. A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE ,�;,!�
<br /> BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION START OF CONSTRUCTION.THE CITY OF EVERETT PUBLIC WORKS (�,* 29•• a
<br /> 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN ON THE PROJECT. 4. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO N', *a+ett,� 22
<br /> CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES,AND IN SUCH A EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO COMMENCEMENT OF CONSTRUCTION. ^-ow,(r
<br /> MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT 4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST STARTING CONSTRUCTION.
<br /> ENTER THE DRAINAGE SYSTEM,ROADWAYS,OR VIOLATE APPLICABLE WATER BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING 5. THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS DEPARTMENT OF A PERSON
<br /> QUALITY STANDARDS. CONSTRUCTION. — WHO CAN BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A
<br /> 24 HOUR BASIS. STAMP
<br /> 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR 5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED"DUMP NO WASTE,
<br /> ANTICIPATED SITE CONDITIONS.DURING THE CONSTRUCTION PERIOD,THESE ESC DRAINS TO STREAM,LAKE,RIVER,PUGET SOUND,OR WETLAND."CHOOSE 6. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL
<br /> FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS APPROPRIATE FEATURE FOR THE PROJECT SEPARATION BETWEEN POTABLE AND NON-POTABLE CONVEYANCE SYSTEMS.
<br /> AND TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE
<br /> THE SITE. 7. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS
<br /> DEPARTMENT PERSONNEL ONLY.ALL VALVES,NEW AND EXISTING,SHALL BE
<br /> 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE ACCESSIBLE AT ALL TIMES
<br /> APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING,
<br /> ESPECIALLY AFTER STORM EVENTS.
<br /> 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A
<br /> MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR CONSULTANT
<br /> STORM EVENT.
<br /> 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO Cl)
<br /> ACCUMULATE WITHIN A TRAPPED CATCH BASIN.ALL CATCH BASINS AND I-
<br /> CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.THE CLEANING
<br /> OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM
<br /> SYSTEM. LLI
<br /> 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING M
<br /> OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. W
<br /> ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS /
<br /> ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
<br /> 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE 0
<br /> DEBRIS AND SEDIMENT TRACKED OFF THE SITE. C//
<br /> 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING a
<br /> SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL.
<br /> 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR
<br /> UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30,
<br /> AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. CD
<br /> Z_
<br /> IO I
<br /> M w
<br /> W 1-
<br /> Z z
<br /> M c
<br /> CK
<br /> Q C
<br /> z
<br /> W Cl)
<br /> W o I -
<br /> U Q M W
<br /> o N cG
<br /> O CDZ OD W
<br /> w W
<br /> •
<br /> g -ce <II-- O
<br /> =w }
<br /> Z W ow H
<br /> 2 Iz w U
<br /> J ..-3 TITLE
<br /> a -
<br /> o # DATE DESCRIPTION
<br /> d
<br /> U
<br /> 612312021 PERMIT
<br /> �' 1/21/2022 BID ISSUE
<br /> 0
<br /> I
<br /> N
<br /> O
<br /> ro REVISIONS
<br /> N
<br /> . MS,BS,AL,EH MDC
<br /> ' DRAWN BY CHECK BY
<br /> a`
<br /> Y
<br /> BID ISSUE
<br /> 0
<br /> STATUS
<br /> d 1/21/2022
<br /> DATE
<br /> E
<br /> rB 81114
<br /> 32880J
<br /> 0
<br /> PROJECT NUMBER
<br /> N
<br /> N
<br /> 0.02
<br /> Know what's below. 02021 OTAK,INC.
<br /> 8i
<br /> O If this drawing t24"z36'.it has been
<br /> Call before you dig. reduced/enlarged.Scale accordingly.
<br />
|