Laserfiche WebLink
GENERAL NOTES: o. *- Houseplants Galore uus,ac <br /> w <br /> ro <br /> 1) Complete installation of mechanical system shall be per the most current building codes and Eve,rgtt Vida <br /> lth IntegratedEvetett Q <br /> regulations as adopted by the local jurisdiction. 1 Cloth9 <br /> 2) All air conditioning units without internal traps shall have a P Trap for the condensate pan with 5�1+ Sound Credi <br /> ersports (l) <br /> tees for cleaning and condensate pipes shall be discharged to existing waste pipe per IMC gvama... jp Union Everel <br /> W <br /> 307.2.4 ycledeale* �r� C V <br /> 3) Mechanical contractor shall coordinate diffuser locations and duct routing clearances with i 9 <br /> structural and reflected ceiling plans. t I .5.. ? <br /> 4) All fire rated structure shall be fire dampered per IMC 607.5. I N 0 Mallory Paint Store Foss AL a 1 v <br /> 5) All air distribution outlets shall have volume control devices per IMC 603.18. I Benjamin Moore Tint Eve • j <br /> 6) Mechanical contractor shall locate and coordinate exact location of piping,ductwork,and Paint store Q U Zi m Q <br /> P P 9 i Car stereo r <br /> penetrations with the structure. *Si 'a '. I air Q Z = C�1 a <br /> 7) Maximum length of flexible duct shall be 20'or as shown on drawings. ,- tdt�� -"- I 9 •� O Z o a rn- <br /> 8) All ductwork,equipments,and piping shall be seismically supported per SMACNA and local - Sea Pac Homes W Z O. 3 z o <br /> regulations per IMC 603.10. I -' C7 Z O J d n <br /> 9) All metal and flexible ductwork shall be constructed as specified in order to conform to t 9 PeopleReady Z - w co a z`O <br /> SMACNA duct construction standards. <br /> t Project Location o Y v,wY <br /> 10) All air filters shall have the minimum MERV value of not less than 6 per IMC 605.4. Project Location= Evolution Industries <br /> 11) All equipment in concealed spaces requiring access shall have access door and a working Custom Creations <br /> space not less than 30"deep and 30"wide per IMC 306.1. <br /> 12) The system ducts will be classified as low pressure ducts whereas all duct joints,seams,and <br /> connections shall be securely fastened and sealed with approved mastic duct sealer per IMC m Site Plan (Ref. Only) Vicinity Map (Ref. Only) <br /> 603.9. l�I <br /> 13) All other related permits required for system start up shall be applied and obtained separately N Scale: N.T.S. *Scale: N.T.S. <br /> by their respective contractors. <br /> 14) The contractor shall not operate the equipment for temporary heating or ventilation during PROPERTY DATA <br /> construction.(All equipment shall run for testing and balancing only per section WSEC <br /> C408.2.2.1) Address:20 SW EVERETT MALL WAY'SUITE 8',EVERETT,WA 98204 <br /> 15) Each fan unit over 2,000 CFM shall have a duct/smoke detector per IMC 606.2 in return ducts <br /> as required by the jurisdiction to have unit shut down upon smoke detection unless the system Property Owner:MALL AND MERIDIAN LLC LEGEND ao <br /> is incapable of spreading smoke beyond the enclosing walls. W <br /> 16) Duct systems shall not have a flame spread index greater than 25 and a smoke develop index Parcel Number:00396900006000 SYMBOL ABBRV DESC. I_ <br /> of not more than 50 per IMC 602.2.1.8. <br /> Lot Size:0.83 ACRES T'Stat Thermostat <br /> 17) Contractor is to bring up discrepancies and items which are not specifically called for or shown, > <br /> but are required for a complete mechanical system. Tenant Area Size:915 SF I_ VD Adjustable volume damper I Z <br /> 18) All equipment supplied for these specifications shall be free from defects in material, 0 J <br /> workmanship,and title. Legal Description:BROADWAY CREST BLK 000 D-00-LOTS 60&61 LESS PTN QQ CD Round Ceiling diffuser(Positive pressure) Q <br /> LOT 61 TO CTY EVE DAF-BEG ATNW COR SD LOT TH N69*29 06E 11 FT ALG Q Q 2 N <br /> SLYMGN EVE MALL WAY TH S34*40 32W 18.O6FT TOE MGN 1ST PLW(HOWARD (N) New work for round duct a I- rn <br /> ENERGY CODE NOTES: AVE)THN00*0753W11FT ALG SDE MGN TPB PER SWDAF8605140335 a 'Pi W Q <br /> �� New work for flex duct -I GC <br /> W <br /> 1) Thermostats shall be a 7-day programmable type thermostat with a 5 degree deadband and Z Q <br /> Li <br /> automatic setback control per WSEC C403.4.2 and WSEC C403.4.1.2.Operating schedules shall CODE COMPLIANCE x CD Square ceiling diffuser <br /> be confirmed and adjusted as necessary. C.) W (13W <br /> cc <br /> 2) During occupancy,the system shall maintain minimum outdoor air ventilation,and on calls for 2018 International Mechanical Code(2018 IMC) X EF Exhaust fan __ ca W <br /> heating and cooling. 2018 International Building Code(2018 IBC) L <br /> 3) HVAC shall meet minimum energy efficiency rating of table C403.3.2 per WSEC C403.3.2. 2018 Washington State Commercial Energy Code(2018 WSEC) 12 Duct Size(0 for round/A X B for square) cc <br /> 4) Duct insulation shall meet rating of table C403.10.1.2 per WSEC C403.10.1.2. 500 CFM Output <br /> All codes shall be referenced with their respective city amendments. CFM <br /> 5) Supply and return ducts in the unconditioned space shall be insulated to a minimum of R-6 <br /> A.F.F. Above finished floor REVISIONS: <br /> insulation per WSEC C403.10.1.2. <br /> 6) Piping insulation shall meet the requirements of Table 403.10.3 per WSEC C403.10.3. SHEET INDEX - HRV Heat Recovery Unit <br /> 7) Outside air shall have motorized dampers or automatic dampers for all outside air intakes per <br /> WSEC 403.7.8.2 M1-Cover Page Reference for Section of Interest A <br /> 8) Piping insulation shall be protected from damage and weather per WSEC C403.10.3.1 M2-Mechanical Main Floor Plan 1 - Page where reference can be found. <br /> 9) HVAC system shall be commissioned and balanced per WSEC C408.2.2. A <br /> 10) Heat pump systems shall be prevented from operating when the heating load can be met by the F - Flag showing sectional point of view <br /> heat pump alone.Supplement heat is permitted during outdoor defrost cycles per WSEC DATE: 2/9/2023 <br /> C403.4.1.1. V - Reducer for spiral ductwork <br /> 11) Air leakage test shall be performed by a third party if necessary to meet a minimum air leakage of SHEET: <br /> — <br /> 0.25 CFM/SF at.3"W.C.per SEC C402.5.1.2. Hidden lines <br /> 12) Close out documents and training of building operations for mechanical components,equipment, <br /> and systems shall be provided at closeout. %: � ! ) F�/��E� <br /> 13) Cooling systems shall have no less than 2 stages of fan control.Low speed shall not be greater 4,,,, r T <br /> than 66%of full speed and shall not draw more than 40%power per SEC C403.8.5.1. REV/ Eft 1 { (, C <br />