Laserfiche WebLink
. _ FlynnC <br /> FLYN11 3414S116thS <br /> Tukwila,WA 98168 <br /> @alga Cat <br /> Date May 09,2023 <br /> Quote#: 832-002084-QQQ <br /> To Project <br /> Washington Federal WAFD-Murphy's Corner 1240-ReCover TPO <br /> 425 Pike Street WAFD Murphy's Corner-1240 <br /> Seattle,WA 98101-3902 12830 Bothell Everett Hwy <br /> Tel:208-570-8989 Everett,WA 98208 <br /> FLYNN IS PLEASED TO PROVIDE THIS QUOTE FOR THE FOLLOWING WORK <br /> AT THE ABOVE NOTED LOCATION <br /> Roof System: TPO <br /> Work Scope: Includes all existing BUR roof section(includes parapet walls) <br /> • Pull a local Building Permit for roof replacement <br /> • Set up a site specific safety plan <br /> • Bring in a forklift to safely lift our tools, equipment, and materials onto and off of the roof <br /> • Remove the existing coping cap metal from the top of the parapet walls and haul away to an <br /> approved dump site. <br /> • Remove the existing roofing from around each roof drain (3'x3'), so we can replace the roof drains. <br /> Roof debris to be hauled away. <br /> • Mechanically fasten a new 1/2" HD coverboard over the existing roof surface. <br /> • Mechanically fasten a new 60 MIL TPO Membrane Roof System <br /> • Install new membrane flashing around the pipes,curbs, drains, and walls <br /> • Replace each of the existing drain with new cast iron style drains. <br /> • Remove the existing wall vents and install TPO clad roof vents as required. <br /> • Existing HVAC units and vents will accommodate the new 1/2" HD coverboard. <br /> • Fabricate and install new coping metal around the perimeter of the roof. <br /> • Provide ownership with a manufacturer's 20 year labor& material warranty <br /> • Clean-up &haul away our debris from this scope of work <br />