Laserfiche WebLink
1 I 2 I 3 I 4 I 5 <br /> SHUTOFF VALVE <br /> q EXPANSION TANK I Mk I)TEMPERATURE AND PRESSURE <br /> RELIEF VALVE 8 DISCHARGE PIPE Z DY K E M A N <br /> SEISMIC TAN ANER UFACTUORERS Ar 7 D c3 o7 ARCHITECTURE + DESIGN <br /> STUDS INSTRUCTIONS <br /> ot< TAhl ' , <br /> _ DRAIN VALVE <br /> ENSURE FLOOR AND WALL ARE FULLY <br /> SEPARATED FROM SOFFIT WITH 5/8' ' .� i DRAIN PAN- <br /> _ Al SEPE SEPARATED <br /> FGYPSUM WALLBOARD. " COORDINATE OUTLET PIPE LOATION <br /> �� / FLUID TOAPPLIED FLASHINGCOLLAR <br /> COORDINATO FLOOR DRAIN <br /> • <br /> • <br /> OVER FLANGE.FULLY SEAL CONSULTANT: <br /> _. _.lAite.11� • DUCT TO FLANGED COLLAR <br /> _Lu ,._ ......,. .,... ......t -.,.:. .. ...... :... li/. SLOPED HOOD AT TOP <br /> \` , I 1 ,/ mil END DAMS TO <br /> ATTACH AT SIDES <br /> >-< I I , CI), ELEVATION @ HOT WATER HEATER <br /> o I 1 n PER IBC 714.4 <br /> I:. PROVIDE BIRD BATT INSULATION TIGHT TO <br /> REGISTRATION STAMPS: <br /> CHEN EXAUST A : 1 SCREEN MESH, INSULATION JACKET(NO <br /> ( •� I I Q TYP. GAPS IN INSULATION) <br /> I T✓"/ I TAPE <br /> ARR ER TO I L:-�—, 1 <br /> C ;. DRYER EXHAUST 1 I SHEATING I I -�� ! <br /> I • <br /> c <br /> / I I:; I '`.�' 1H PARTY WALL <br /> / I I L �_ ! <br /> APPROVED PUTTY PAD <br /> 1 , -' ! FULLY SURROUND BOX,SEAL TO BACK SIDE <br /> PROVIDE FIRE f -! <br /> si OF GWB,AND AROUND CABLE PENETRATIONS <br /> —I I'> CAULK I � , � �� <br /> AT MEMBRANE r I 'i II <br /> �� ;.•::..v PENETRATION _- <br /> (TY ) EXTERIOR I / �� PROJECT IDENTIFICATION: <br /> Shoreside Village <br /> �. 1,!lfil 1-2 CLR MIN.2 DUCTS % SOFFIT FRAMING �' <br /> '!jl ;►��9 I Renovations <br /> �J Ill INTERIOR ' •��; FOR <br /> I ill % :1.-� I ELECTRICAL BOX-1/8'MAX SPACE MINN. <br /> < '.1 Ili ' ���-! BOX AND WALLBOARD <br /> • .. 1 Williams <br /> �o- ! Investments <br /> AT <br /> 625 and 701 75th St.SE, <br /> MEMBRANE PENETRATION-ELECTRICAL Everett,WA 98203 <br /> EDResidential Vent Soffit and Termination(Typ) BOXES <br /> CD, <br /> Building Permit Set <br /> INSTALL 5/8"TYPE X WATER RESISTANT <br /> B I PER IBC 715 DRYWALL AS REDID TO ENSURE FIRE B <br /> RATING AT RATED WALLS. PER IBC 715 <br /> =� This drawing Is: <br /> TUB, ♦� 1.Copyright 2020 Dykeman,Inc, <br /> �� 2.The Architect's Instrument of Professional Service. <br /> ��— 1 HR PARTY WALL 3.For use on this project only.Obtain Architect's <br /> FIRE CAULKING AT FLOOR. • <br /> �' written permission for any other use or reproduction. <br /> FILL ANNULAR SPACE,CONFIRM - �� <br /> COMPATIBILITY WITH ALL CONTACTING �' APPROVED FIRE CAULKING PER IBC714.4 <br /> MATERIALS. PROJECT NUMBER: <br /> • CAULK OR SEALANT-1 T PACK WITH MINERAL WOOL <br /> FACTURER,AND FILL <br /> I FIRE CAULKING AT FLOOR PER 1 HR FLOOR 11111,, <br /> `�� ANNUIIAR SPACE.CONFIRMNG AS REDD BY UCOMPATIBILITY WITH ALL <br /> """""""A2/A9.10 ASSEMBLY I `� / CONTACTING MATERIALS ;+i� 2021-035 <br /> I ► APPLY AT SILL PLATE WHEN ACCESSED FROM ABOVE. •• <br /> •_ - :�---1HR WALL ASSEMBLY III �� ' I `_�i REVISIONS: <br /> _- .u , IH PARTY WALL <br /> IT` °'„' MARK DATE DESCRIPTION <br /> - <br /> L i�,'�-quer'1 APPROVED FIRE CAULKING 3 0629/2021 Permit Corrections-6292021 <br /> I HR FLOOR ASSEMBLY ��- CAULK OR SEALANT-FILL ANNULAR <br /> `-���- , SPACE TO FULL DEPTH OF <br /> g WALLBOARD.CONFIRM _ <br /> .—��� �I COMPATIBILITY WITH ALL <br /> pipipktAff <br /> t4INSTENTRRALLYOR <br /> /' A CONTACTING MATERIALS. <br /> •r1 � PRINCIPALINCHARGE?MS <br /> PROJECT MANAGER: IDH <br /> '~ ..,...._,,,i, , <br /> � ' ��/� CONCENTRICALLY WITHIN OPENING. PROJECT ARCHRECT:I <br /> /x. • hh �,;, �,. ANNULAR SPACE BETWEEN CABLE AND JOB CAPTAIN: I GM <br /> A7iw7m--.,.IIIIIIk I PERIPHERY OF OPENING TO BEAPPROVED FIRE CAULKING - BETWEEN SAND 1 IN. DRAWING TITLE: A <br /> CAULK OR SEALANT-PACK WITH MINERAL WOOL !. 1/. I <br /> °jBACKING AS REQ'D BY ONFIRMFACTURER,ANDFILLI, ��' FIRE PROTECTION <br /> ANNULAR SPACE.CONFIRM COMPATIBILITY WITH ALL <br /> CONTACTING MATERIALS. <br /> APPLY AT UPPER WALL PLATE WHEN ACCESSED DETAILS <br /> FROM BELOW. <br /> a DRAWING NUMBER: <br /> MEMBRANE PENETRATION-PLUMBING THROUGH PENETRATION-PLUMBING PIPES MEMBRANE PENETRATION -PLUMBING <br /> (1),PIPES AT TUB A2 IN WALL EDPIPES A(�Q 1 O <br /> , 1 2 I 3 I 4 I 5 <br />