LIMITS OF LIABILITY: WORK REQUIREMENTS: ABBREVIATIONS: LEGEND: -i
<br /> RYKA CONSULTING HAS MADE EVERY EFFORT TO CREATE COMPLETE AND 1. ALL WORK MUST BE PERFORMED DURING THE OWNERS PREFERRED / -- --�--�SUBJECT BOUNDARY LINE
<br /> ACCURATE CONTRACT DOCUMENTS WITH THE.BEST INFORMATION HOURS. A/C AIR CONDITIONING MAX MAXIMUM
<br /> AVAILABLE AT THE TIME OF THEIR COMPLETION. CONTRACTORS ARE AGL ABOVE GROUND LEVEL MECH MECHANICAL - - ADJACENT BOUNDARY LINE
<br /> DOCUIONEDMENT THAT MINOR DSSHA OR ERRORS IE THE CONTRACT 2. THE CTRUCTION R SH ETBE SOLELYDS. RESPONSIBLE FOR ALL AMSL ABOVE PPRO MEANAT SEA LEVEL MTLFR METAL
<br /> ------- a t&t
<br /> DOCUMENTS MAY OCCUR AND SHALL NOT EXCUSE THE CONTRACTOR FROM CONSTRUCTION MEANS. METHODS, TECHNIQUES. SEQUENCES, AND APPROX APPROXIMATELY MFR MANUFACTURE ----------SECTIONAL BREAKDOWN LINE
<br /> COMPLETING THE PROJECT AND IMPROVEMENTS IN ACCORDANCE WITH THE PROCEDURES FOR COORDINATING ALL PORTIONS OF THE WORK UNDER AWG AMERICAN WIRE GAGE MGR MANAGER - RIGHT-OF-WAY CENTERLINE
<br /> INTENT OF THE DOCUMENTS. REFERENCE ADMINISTRATIVE REQUIREMENTS. THE CONTRACT. MIN MINIMUM
<br /> BCW BARE COPPER WIRE MISC MISCELLANEOUS - - RIGHT-OF-WAY LINE �� Mobility
<br /> 3. ALL WORK PERFORMED ON THE PROJECT SHALL BE IN ACCORDANCE WITH BLDG BUILDING
<br /> CONTRACT DOCUMENTS: ALL APPLICABLE CODES AND STANDARDS. SEE STRUCTURAL NOTES. BLK BLOCKING NA NOT APPLICABLE -COAX--COAX--WAX-COAX CABLE UNE
<br /> NIC NOT IN CONTRACT --FIBER-FIBER FIBER OPTIC CABLE LINE
<br /> 1. THE CONTRACT DOCUMENTS INCLUDE THE AGENCY APPROVED 4. IF INSPECTION OF WORK IS REQUIRED, THE CONTRACTOR SHALL NOTIFY CLR CLEAR NTS NOT TO SCALE
<br /> PROJECT SPECIFICATIONS. PLANS, AND THEIR LATEST REVISIONS, THE INSPECTION ENTITY 24 HOURS IN ADVANCE OF THE WORK TO BE COAX COAXIAL CABLE OHP-OHP OVERHEAD POWER LINE -.....»«-,.. --«.d
<br /> ADDENDA, AND CLARIFICATIONS. THE CONTRACT DOCUMENTS MAY PERFORMED. CONC CONCRETE OC ON CENTER OHT OHT OVERHEAD TELEPHONE LINE
<br /> ALSO INCLUDE NETWORK CARRIER STANDARDS FOR INSTALLATION OF CONST CONSTRUCTION OD OUTSIDE DIAMETER
<br /> TELECOMMUNICATIONS EQUIPMENT. 5. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH UTILITY CONE CONTINUOUS -UGP-TGP-UGP- BURIED POWER LINE RYKA ONSULTING
<br /> AGENCIES PRIOR TO WORK WITH UTILITIES. REFERENCE UTILITIES SECTION. PLYWD PLYWOOD
<br /> 2. THE CONTRACTOR SHALL KEEP A MINIMUM OF ONE SET OF CONTRACT DIA DIAMETER PROJ PROJECT -GAS-GAS-GAS- BURIED GAS LINE
<br /> DOCUMENTS ON FILE IN THE PROJECT OFFICE AT THE JOB SITE. 6. THE CONTRACTOR SHALL COORDINATE ON-SITE STORAGE WITH OWNER IN DWG DRAWING- PROP PROPERTY -UGT-UCT-UGT- BURIED TELEPHONE LINE
<br /> COPIES OF THE PROJECT DOCUMENTS USED BY SITE STAFF SHALL BE ADVANCE OF WORK. PERMITS MAY BE REQUIRED FOR STORAGE ON PT PRESSURE TREATED 5 628 AIRPORT WAY
<br /> UP TO DATE WITH THE PROJECT OFFICE COPY. PUBLIC RIGHT OF WAY. EA EACH -W-W-W-W- BURIED WATER UNE
<br /> ELEV ELEVATION REQ REQUIRED SOUTH, SUITE 330
<br /> 3. THE CONTRACTOR SHALL NOTIFY THE PROJECT TEAM OF ANY ERRORS, 7. ALL NEW CONSTRUCTION SHALL MATCH EXISTING CONSTRUCTION IN FORM, ELEC ELECTRICAL RF RADIO FREQUENCY -SS SS SS- BURIED SANITARY SEWER
<br /> OMISSIONS, AND INCONSISTENCIES FOUND IN THE CONTRACT TEXTURE, FINISH, AND IN MATERIALS EXCEPT AS NOTED IN THE EC) EQUAL RM ROOM SEATTLE, WA 98108
<br /> DOCUMENTS. THE NOTIFICATION SHALL BE GIVEN BOTH VERBALLY AND CONSTRUCTION DOCUMENTS. EQUIP EQUIPMENT RO ROUGH OPENING -SD sDsG- BURIED STORM DRAIN
<br /> IN WRITING WITHIN 24 HOURS OF DISCOVERY. EXT EXTERIOR RRH REMOTE RADIO HEAD - - - - • -DITCH LINE/FLOW LINE
<br /> 8. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PROTECT EXISTING RRU REMOTE RADIO UNIT
<br /> 4. IF AN ERROR OR OMISSION IN THE PROJECT DOCUMENTS REQUIRES WORK FROM DAMAGE DURING THE COURSE OF WORK FOR THIS PROJECT. FIN FINISH VEGETATION UNE
<br /> RECTIFICATION. THE CONTRACTOR SHALL SUBMIT A PROPOSAL TO THE FLUOR FLUORESCENT SHT SHEET -X-X-X-X-X-CHAIN LINK FENCE
<br /> PROJECT TEAM TO RECTIFY THE ISSUE. THE PROPOSAL MUST BE 9. THE CONTRACTOR SHALL PROVIDE WORK WHICH IS LEVEL, PLUMB, AND FLR FLOOR SIM SIMILAR RFDS V2.00 DATED:02/21/2023
<br /> APPROVED PRIOR TO WORK. WITHIN TOLERANCES SPECIFIED BY CODES AND STANDARDS INCLUDED IN FT FOOT SPEC SPECIFICATION p p O WOOD FENCE
<br /> THE STRUCTURAL NOTES. FRP FIBER-REINFORCED SF SQUARE FOOT
<br /> 5. THE CONTRACT DRAWINGS ARE PREPARED TO SCALE WITH THE BEST POLYMER SS STAINLESS STEEL -R-R-R-R-R-R-R-R-BARBED WIRE/WIRE FENCE
<br /> KNOWLEDGE OF THE SITE GIVEN TO RYKA CONSULTING. WHERE 10.THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS STL STEEL
<br /> DIMENSIONS ARE NOT SHOWN IN THE DRAWINGS, THE CONTRACTOR ACCORDING TO MANUFACTURER'S SPECIFICATIONS UNLESS NOTED GA GAUGE STRUCT STRUCTURAL
<br /> SHOULD CLARIFY WITH THE PROJECT TEAM WHEN THE INFORMATION OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE PRECEDENCE. GALV GALVANIZED STD STANDARD WA6 2 9 9
<br /> IS CRITICAL TO PROPER INSTALLATION. GC GENERAL CONTRACTOR SUSP SUSPENDED TRANSFORMER -9- FIRE HYDRANT
<br /> 11.ANY SUBSTITUTIONS OF MATERIALS MUST BE APPROVED BY THE PROJECT GPS GLOBAL POSITIONING SYSTEM X( LIGHT STANDARD DC GATE VALVE
<br /> 6. THE CONTRACTOR SHALL DOCUMENT ALL CHANGES AND TEAM IN WRITING. GRND GROUND THRU THROUGH
<br /> SUBSTITUTIONS ON THE PROJECT OFFICE COPY OF THE CONTRACT TMA TOWER MOUNTED AMPUFIER n POWER VAULT ® WATER METER PORT GA R D N E R
<br /> DOCUMENTS. 12.THE CONTRACTOR SHALL SUPPLY ALL MATERIALS INCIDENTAL TO THE HORZ HORIZONTAL TNNG TINNED
<br /> WORK DESCRIBED BY THE CONTRACT DOCUMENTS. HR HOUR TYP TYPICAL ® UTILITY BOX a FIRE STAND PIPE
<br /> 7. WHEN FABRICATION OF STRUCTURAL ITEMS ARE REQUIRED, IT MAY BE HT HEIGHT Fl UTILITY POLE 0 CATCH BASIN, TYPE I
<br /> NECESSARY TO SUBMIT SHOP DRAWINGS FOR REVIEW BY RYKA 13.THE CONTRACTOR MUST RESTORE ALL PORTIONS OF THE PROJECT SITE HVAC HEATING VENTILATION AIR CONDITIONING UNO UNLESS NOTED OTHERWISE
<br /> CONSULTING. SEE STRUCTURAL NOTES. TO IT'S PRE-WORK CONDITION. WHERE THE WORK PERFORMED DOES NOT E- POLE GUY WIRE ® CATCH BASIN, TYPE II
<br /> ALLOW FOR PRE-WORK RESTORATION, WORK AREAS MUST BE REPAIRED D NSIDE DIAMETER VERT VERTICAL
<br /> 8. DEFERRED SUBMITTALS ARE REQUIRED FOR MATERIALS TO BE OR REPLACED TO MATCH EXISTING FINISH AND SITE GRADING. N NCH VIF VERIFY IN FIELD III GAS VALVE -a- SIGN
<br /> PROVIDED BY THE CONTRACTOR. WHERE MATERIALS IN THE PLANS NFO NFORMATION ® GAS METER c BOLLARD
<br /> ARE DESIGNATED AS PROVIDED BY CONTRACTOR, THE CONTRACTOR 14.THE CONTRACTOR IS RESPONSIBLE FOR ALL DISPOSAL OF DEBRIS AND NSUL NSULATION W/ WITH
<br /> SHALL SUBMIT THE PREFERRED MATERIAL TO THE PROJECT TEAM FOR ITEMS WHICH ARE SPECIFIED TO BE REMOVED IN THE COURSE OF WORK. NT NTERIOR W/O WITHOUT n TELEPHONE VAULT o MAIL BOX
<br /> REVIEW AND APPROVAL PRIOR TO WORK. BC NTERNATIONAL BUILDING CODE WP WATER PROOF o TELEPHONE_RISER 234.21 SPOT ELEVATION
<br /> ADMINISTRATIVE REQUIREMENTS: CAST-IN PLACE CONCRETE: LBS POUNDS 1321 COLBY AVENUE
<br /> LMU LOCATION MEASUREMENT UNIT
<br /> 1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS 1. ALL CONCRETE DESIGN DESCRIBED BY THIS SET OF DRAWINGS IS LTE LONG TERM EVOLUTION EVERETT,WA 98201
<br /> REQUIRED (INCLUDING FEES)TO COMPLETE THE WORK DESCRIBED BY BASED ON ACI 318 0 REVISION SNOHOMISH COUNTY
<br /> THE CONSTRUCTION DOCUMENTS.
<br /> 2. PRIOR TO BIDDING, THE CONTRACTOR IS RESPONSIBLE FOR REVIEW 2. ALL STRUCTURAL CONCRETE SHALL HAVE A MINIMUM 28-DAY CONCRETE SLABS ON GRADE:
<br /> OF THE PROJECT SITE AND CONTRACT DOCUMENTS TO UNDERSTAND OTMPRESSIVE STRENGTH OF 4.000 PSI. UNLESS SPECIFIED 1. SLAB-ON-GRADE CONSTRUCTION SHALL BE SUPPORTED ON A 6 INCH 0 GRID REFERENCE - ---
<br /> THE DESIGN AND CONDITIONS AFFECTING THE WORK TO BE OTHERWISE. LAYER OF CLEAN 3/4 INCH MINUS SUBGRADE COMPACTED TO A REVISIONS
<br /> PERFORMED. ANY ERRORS, OMISSIONS, AND DISCREPANCIES MUST BE 3. EACH CONCRETE MIX DESIGN SHALL HAVE A CYLINDER TEST HISTORY DENSITY OF NO LESS THAN 95X OF THE MODIFIED PROCTOR APPROVED
<br /> SUBMITTED TO THE PROJECT TEAM VERBALLY AND IN WRITING. OF 60 DAYS MINIMUM, TESTED IN ACCORDANCE WITH ASTM C39, MAXIMUM DRY DENSITY(ASTM D-1557). SUBGRADE SHALL BE a DETAIL REFERENCE iiiiMILME® RN
<br /> TESTED BY AN ACI CERTIFIED STRENGTH TESTING TECHNICIAN. AND SUPPORTED ON UNDISTURBED NATIVE SOIL OR PROPERLY PLACED
<br /> 3. THE CONTRACTOR SHALL PROVIDE A WARRANTY FOR WORK FOR A THE STRENGTH STATISTICALLY DETERMINED IN ACCORDANCE WITH ACI AND COMPACTED STRUCTURAL FILL. KMEMI INIE1221=2=1= BY
<br /> PERIOD OF ONE YEAR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR 318. EACH MIX DESIGN USED ON SITE SHALL BE SUBMITTED TO, .2. ISSUED FOR Sox Co SEW MEM
<br /> AND SHALL REMEDY ALL FAULTY. INFERIOR.AND/OR IMPROPER AND RECEIVED BY THE PROJECT TEAM BEFORE THE CONCRETE IS 2. INTERIOR SLABS-ON-GRADE SHALL BE CAST OVER A 4 MIL VAPOR ELEVATION REFERENCE WEE WEENEEI ISSUES FOR 10DX CONSTRUCTION
<br /> MATERIALS. DAMAGED GOODS. AND/OR FAULTY WORKMANSHIP. ALL PLACED ON SITE. BARRIER. �C3' ME 03/0e/23 ISSUED FOR 100%CD REVIEW liall
<br /> ROOFING AND WATERPROOFING MUST BE WARRANTED FOR A PERIOD
<br /> OF TWO YEARS. THE PERIOD BEGINS AT SUBSTANTIAL COMPLETION OF 4. RAW MATERIALS, MANUFACTURE, AND DELIVERY TO THE FORMWORK 3. PROVIDE CONTROL JOINTS IN ALL SLABS ON GRADE. JOINTS ARE Ng - ISSUED FOR toot CONSTRUCTION RID -.
<br /> THE PROJECT. SHALL BE IN ACCORDANCE WITH ASTM C94 AND ACI 318. TO BE INSTALLED AT 14 TO 16 FEET ON CENTER EACH WAY © SECTION REFERENCE I♦ ,
<br /> MAXIMUM UNLESS SHOWN OTHERWISE ON THE DRAWINGS. AU.SAW W iiiii-
<br /> IMEMEMOMME MM.
<br /> 4. THE CONTRACTOR SHALL PROVIDE A COPY OF LICENSE AND 5. EMBEDDED ITEMS ARE TO BE SECURELY FASTENED SO THAT THEY DO CUT JOINTS IN CONCRETE SLABS ARE TO BE MADE WITH AN EARLY -
<br /> INSURANCE TO THE TELECOMMUNICATIONS CARRIER. NOT MOVE DURING PLACEMENT OF THE CONCRETE. REFERENCE THE CUT SAW AS SOON AS POSSIBLE AFTER POURING BUT NO LATER
<br /> REINFORCING STEEL SECTION. THAN ONE HOUR AFTER FINISHING.
<br /> SITE SAFETY: 6. TWO CYUNDERS SHALL BE TAKEN FOR EACH LOAD DELIVERED TO THE 4. PROVIDE ISOLATION JOINTS AROUND ALL COLUMNS/SPREAD In_IIIIIIIIIIIIIIIIIIIIIII NMI
<br /> FORMWORK. SAMPLES ARE TO BE TAKEN FROM THE CONCRETE AS IT FOOTINGS. JOINTS SHALL BE FORMED BY INSERTING PREFORMED
<br /> 1. THE CONTRACTOR SHALL PROVIDE OSHA COMPLIANT PROTECTION FOR IS PLACED IN THE FORMWORK IN ACCORDANCE WITH ASTM C172. JOINT FILLER FOR THE FULL DEPTH OF THE SLAB.
<br /> THE SAFETY OF THE SITE STAFF AT ALL TIMES DURING THE CYUNDERS ARE TESTED PER ASTM C39 AND TESTED BY AN ACI 04-26-2023
<br /> CONSTRUCTION OF THE PROJECT. CERTIFIED CSTT. CONCRETE SAMPLES ARE TO BE TESTED FOR AIR 5. PROTECT CONCRETE FROM DAMAGE OR REDUCED STRENGTH DUE TO
<br /> CONTENT AND WATER CEMENT RATIO. ALL TEST RESULTS ARE COLD OR HOT WEATHER IN ACCORDANCE WITH ACI 305 AND 306.
<br /> 2. CONTRACTOR SHALL KEEP GENERAL WORK AREA CLEAN AND HAZARD SUBMITTED TO THE PROJECT TEAM WITHIN ONE MONTH OF PLACING CONTRACTOR SHALL TAKE SPECIAL CURING PRECAUTIONS TO MINIMIZE
<br /> FREE DURING CONSTRUCTION. SITE SHALL BE LEFT IN CLEAN THE CONCRETE ON SITE. SHRINKAGE CRACKING OF CONCRETE SLABS. M C D ^4/
<br /> CONDITION AND FREE FROM DIRT AND DEBRIS. SURFACES SHALL BE _ 1v` �'I
<br /> CLEANED OF GREASE, PAINT, OR OTHER MATERIALS NOT SPECIFIED 7. WHEN AMBIENT TEMPERATURES FALL BELOW 55 DEGREES FAHRENHEIT, 6. THE CONTRACTOR SHALL TAKE CARE THAT HEAVY EQUIPMENT AND r' �ate' \"
<br /> IN THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL FOLLOW GUIDELINES DESCRIBED IN ACI 306. AREAS USED FOR STAGING DO NOT AND DAMAGE SLABS ON GRADE. r .' ETT P of WASH
<br /> WHEN AMBIENT TEMPERATURES RISE ABOVE 90 DEGREES FAHRENHEIT, DAMAGED SLABS ON SHALL BE REPAIRED OR REPLACED AT NO _
<br /> 3. THE CONTRACTOR IS TO PROVIDE PROTECTION FOR ADJOINING THE CONTRACTOR SHALL FOLLOW GUIDELINES DESCRIBED IN ACI 305. ADDITIONAL EXPENSE TO THE OWNER. �gqe g�gaapp FOR ? C
<br /> PROPERTIES FROM PHYSICAL HARM, NOISE. DUST. DIRT, AND FIRE THE CONCRETE SHALL BE PROTECTED FROM FREEZING OR FROM E tl� 6J " ` PERMIT `e APB _ � /�
<br /> AS REQUIRED BY THE GOVERNING AGENCIES. THE CONTRACTOR IS EXCESSIVE HEAT WITH TENTS OR BLANKETS TO PROVIDE FOR HEAT 7. CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH 0 f : Z
<br /> RESPONSIBLE FOR REPAIR OF ANY DAMAGE. OR MOISTURE LOSS. OF 2,500 PSI. UNLESS SPECIFIED OTHERWISE.
<br /> 4. THE CONTRACTOR IS RESPONSIBLE FOR THE SECURITY OF THE 8. ALL CONCRETE SHALL BE PLACED AS CLOSE TO PRACTICAL TO THE
<br /> PROJECT SITE AREA. FINAL DESTINATION IN THE FORM. CONCRETE SHALL NOT BE PLACE CONCRETE OR MASONRY ANCHORAGE: A ',11T�' � 4'
<br /> FROM A HEIGHT GREATER THAN 6 FEET FROM THE POINT OF
<br /> 5. WHERE WORK REQUIRES OPEN HAZARDS TO SITE STAFF, THE DISCHARGE. 1. EXPANSION BOLTS INTO CONCRETE SHALL BE 'KWIK BOLT TZ'AS ,0.3 Li '
<br /> HAZARD SHALL BE TEMPORARILY MITIGATED TO OSHA STANDARD MANUFACTURED BY THE HILTI CORP., INSTALLED IN STRICT
<br /> UNTIL THE HAZARD IS CLOSED. 9. VIBRATION SHALL BE USED TO CONSOLIDATE CONVENTIONAL ACCORDANCE WITH ITC-ES REPORT ESR-1917. SPECIAL 0 ,•FG I S T E' O ��
<br /> CONCRETE. EXTERNAL STINGER VIBRATORS SHALL BE INSERTED INSPECTION IS REQUIRED. EXPANSION ANCHORS EXPOSED TO
<br /> 6. SEE STRUCTURAL NOTES. VERTICALLY INTO FORMS EVERY 36 INCHES MAXIMUM AND FOR EACH WEATHER SHALL BE STAINLESS STEEL. Know what's below. `G e
<br /> OF 12 INCHES INTOLIFT. STINGER R APREVIOUS LIFTS TOTORS SHALL BE SENSURE CONSOLIDATION.ERTED TO A VERTICAL CALL
<br /> CALL before you dig. Si� ON AL `\
<br /> UTILITY REQUIREMENTS: FOLLOW GUIDELINES USED IN ACI 309R. REINFORCING STEEL:
<br /> 1. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH UTILITY 10.REPAIRS FOR MINOR DEFECTS MAY BE ADMINISTERED BY AN 1. ALL DETAILING, FABRICATION, AND PLACEMENT OF REINFORCING STEEL tia EXPIRES 01-09 2025
<br /> SHALL BE IN ACCORDANCE WITH THE ACI MANUAL OF CONCRETE -- -- ----- ----- ---
<br /> AGENCIES PRIOR TO WORK WITH UTILITIES. EXPERIENCED CRAFTSMAN WITHOUT AN APPROVED PROCEDURE. A PRACTICE.
<br /> MINOR DEFECT INCLUDES BUG HOLES. HONEYCOMBING, CHIPS. AND
<br /> 2. CONTRACTOR TO LOCATE ALL UTIUTIES PRIOR TO WORK. SPALLS THAT DO NOT EXCEED t INCH OF DEPTH INTO THE FACE OF � , ° TITLE
<br /> 2. REINFORCING BARS SHALL BE DEFORMED AND CONFORM TO ASTM
<br /> THE CONCRETE. MAJOR REPAIRS EXTENDING BEYOND INCH OF A615 OR A706, GRADE 60. REINFORCING TIE WIRE MAY BE GRADE �'• t r GENERAL NOTES
<br /> 3. CONTRACTOR TO PROTECT, REPLACE AND/OR REROUTE ANY DEPTH AND UP TO THE REINFORCING MAY BE REPAIRED WITH AN 40, \ I/
<br /> EXISTING UTILITIES ENCOUNTERED DURING THE COURSE OF WORK. APPROVED REPAIR PROCEDURE. REPAIR PROCEDURES MAY BE +' , •
<br /> SUBMITTED TO THE PROJECT TEAM FOR APPROVAL IN ADVANCE OF 3. REINFORCING STEEL SPLICES SHALL BE 40 BAR DIAMETERS OR TWO
<br /> FIELD WORK. DAMAGE EXTENDING BEYOND STEEL REINFORCING TRANSVERSE WIRE SPACINGS FOR WIRE MATS.
<br /> SPECIAL CONSIDERATIONS FOR WEATHERPROOFING: REQUIRES A RETROFIT DESIGN OR IS REJECTED. DIG ALERT SHEET
<br /> 1. ALL PENETRATIONS TO EXISTING STRUCTURES MUST BE SEALED 11.SEE ARCHITECTURAL NOTES FOR CONCRETE FINISH REQUIREMENTS 4. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE IN
<br /> WITH APPROVED WEATHERPROOFING. IF WEATHERPROOFING IS ACCORDANCE WITH ACI 318. WB.S111TIQfOTIB1I.COTT1 J■
<br /> OMITTED, CONTACT THE PROJECT TEAM FOR CLARIFICATION OR EXISTING STRUCTURES: 5. NO.5 OR LARGER REINFORCING BARS SHALL NOT BE RE-BENT • G_ i
<br /> PROVIDE A WEATHERPROOFING PROPOSAL FOR APPROVAL. WITHOUT APPROVAL BY THE STRUCTURAL ENGINEER.
<br /> 1. THE EXISTING FRAMING IS REPRODUCED FROM THE LATEST CALL AT LEAST TWO WORKING
<br /> 2. CONTRACTOR SHALL COORDINATE WITH OWNER AND THE EXISTING 6. WELDING OF REBAR IS NOT ALLOWED WITHIN THE MIDDLE THIRD OF " -- - - -INFORMATION
<br /> PROVIDED. SOME FRAMING AND MATERIALS
<br /> ROOFING CONTRACTOR OF RECORD FOR ANY AUGMENTATION TO THE THE BAR LENGTH. WELDING OF REBAR IS CONDUCTED IN DAYS BEFORE YOU DIG
<br /> ENCOUNTERED AT THE TIME OF CONSTRUCTION MAY VARY FROM THAT
<br /> ROOF MEMBRANE, AND HAVING THE WORK GUARANTEED UNDER THE SHOWN IN THE PLANS. IF THE PLAN CONDITION VARIES FROM THE RM N:ACCORDANCE WITH AWS D1.4. USE ONLY ASTM A706 REINFORCING. PROPRIETARY INFOATIO
<br /> ROOFING CONTRACTOR'S EXISTING WARRANTY. AS-BUILT CONDITION, THE CONTRACTOR SHOULD CONSULT THE THE INFORMATION CONTAINED IN THIS SET OF ggg
<br /> PROJECT TEAM FOR A REVISED DETAIL OR DIRECTION TO PROCEED. 7. WIRE REINFORCING CONFORMS TO ASTM A82 OR A185. .CONSTRUCTION DOCUMENTS IS PROPRIETARY BYg
<br /> NATURE. ANY USE OR DISCLOSURE OTHER it
<br /> 8. CONCRETE COVER FOR REINFORCING STEEL CONFORMS TO ACI 318. THAN THAT WHICH RELATES TO AT&T MOBILITY
<br /> SERVICES IS STRICTLY PROHIBITED.