|
SPLIT HEAT PUMP SCHEDULE-OUTDOOR UMT
<br /> NOMINAL RATED COOLING RATED HEATING COP/ ELECTRICAL SOUND POWER,WEIGHT,
<br /> EQUIP NO. SERVICE CAPACITY TONS CAPACITY,BTUH SEER2 CAPACITY.BTUH HSPF2 USA LBS BASIS OF DESIGN CONNECTED INDOOR UNIT
<br /> VOLTAGE MCA MOCP
<br /> HP-1 PERIMETER ZONE 1.5 19,300 14.30 19,300 3.617.5 208-230V11P 12 20 73 141 TRANE 4WR4018G/000A FCU-1 •
<br /> HP-2 INTERIOR ZONE 3.5 40,500 14.30 39,500 3,817.5 208-230V/1P 25 40 72 216 TRANE 4WR404201000A FCU-2
<br /> NOTES:(1) AR LISTED WITH ALL STANDARD FEATURES,INSTALLATION ACCESSORIES AND COMPRESSOR SHORT CYCLING PROTECTION.FILTER DRIER,REFRIGERANT LINE FILTER.LIQUID SOLENOID VALVE,AND SAFETY PRESSURE SWITCHES.INSTALL
<br /> REFRIGERANT TUBING IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
<br /> SPLIT HEAT PUMP SCHEDULE-INDOOR UNIT
<br /> EQUIP NO. SERVICE NOMINAL MOUNTING/ ECONOMIZER FAN ELECTRICAL(2) WEIGHT, BASIS OF DESIGN CONNECTED OUTDOOR UNIT
<br /> CAPACITY,TONS DISCHARGE YIN AIRFLOW,CFM ESP,IN WG VOLTAGE MCA MOCP LEG
<br /> FC161 PERIMETER ZONE 1,5 DUCTED N(3) 600 0.7 DON-DD0V/1P 27 30 120 TRANETEM4ADB18521SB HP-1 m 0
<br /> FCU-2 INTERIOR ZONE 3.5 DUCTED N(3) 1,400 0.7 DON-DD0V/TP 55 60 140 TRANETEM4ADC425415C HP-2 e, E
<br /> f i
<br /> NOTES:(I) PROVIDE ELECTRICAL DISCONNECT SWITCH AND INDIVIDUAL THERMOSTAT FOR EACH UNIT. w W p
<br /> (2) INCLUDES AUXILIARY STRIP HEAT. u o
<br /> (3) ECONOMIZER EXCEPTION:LIGHTING&EQUIPMENT LOADS<5 WATTS/SF(C403.5 EXCEPTION 1).
<br /> 0
<br /> 0
<br /> S o
<br /> ENERGY RECOVERY VENTILATOR SCHEDULE
<br /> EFFECTIVENESS,Ya FAN ELECTRICAL
<br /> EQUIP NO. SERVICE HEAT WEIGHT BASIS OF DESIGN 0
<br /> SENSIBLE HEATING, COOLING,EXCHANGER AIRFLOW,FAN POWER, ESP. FAN CONTROL FAN OPERATION VOLTAGE MCA MOCP (LBS)
<br /> ENTHALPY ENTHALPY CFM WICFM IN WG
<br /> ERV-1 ALL 72 68 57 PLATE 305 15 0.5 CONSTANT VOLUME CONHNOUS 208-23RV11P 5.1 15 110 MITSUBISHILGH-F4TDRVX2-E ��❑❑❑
<br /> NOTES:U) ENERGY RECOVERY SYSTEM SHALL HAVE 60%MINIMUM SENSIBLE RECOVERY EFFECTIVENESS OR 50%ENTHALPY RECOVERY EFFECTIVENESS.FAN POWER SHALL NOT EXCEED 1 WICFM WSEC C403,3.5.1 OOO*'4O'J ACh-9
<br /> (2) PROVIDE MOTORIZED DAMPERS ON INTAKE AND EXHAUST OUTLETS PER WSEC C403.7.8.1.GRAVITY DAMPERS MAY BE USED IN LIEU OF MOTORIZED DAMPERS WHERE AIRFLOW IS LESS THAN 400 CFM PER EXCEPTION I. %A,' �*. ❑
<br /> (3) NO CONDENSATE DRAIN REQUIRED. CI'% . ❑
<br /> _ ❑
<br /> V !ice g
<br /> DIFFUSER SCHEDULE Q4146
<br /> TAG DESCRIPTION ARIFLOW,CFM NC AT MAX CFM THROW,50FPM AT FACE SIZE,IN NECK,IN MOUNTING BASIS OF DESIGN
<br /> MAX/MIN CFM . `c.
<br /> U q
<br /> CD-1 CEILING DIFFUSER 0-100 0 12/17 BOB 40 PER PLANS PRICESMCD Z a
<br /> CO-2 CEIUNG DIFFUSER 65-1B0 20 6/10 12x12 60 PER PLANS PRICESMCD
<br /> - __I y
<br /> CD-2 CEILING DIFFUSER 55-200 23 4/9 24x24 60 PER PLANS PRICESMCD Q
<br /> CD.4 CEILING DIFFUSER 150-350 30 7/12 24x24 80 PER PLANS PRICE RCD U R >w
<br /> ES-I CEILING EXHAUST GRILLE 0-450 29 9114 12c12 100 PER PLANS PRICE5102 Z y o w
<br /> MECHANICAL COMPLIANCE SUMMARY 1 RG-1 CEILING RETURN GRILLE 0-2,000 D 0 24x24 24824 PER PLANS PRICE80 = c wmm
<br /> 0
<br /> +.m, _ �� +.+n,;p,�.,,a,.n RG2 CEILING REREIN GRILLE 0-900 0 0 24412 24412 PER PLANS PRICE 510Z U y `�a
<br /> W 1 K j rn
<br /> Project 0 1.i. I Dute: Apr 25,2023 n of 9
<br /> e
<br /> Inb rpiaa, Prof.
<br /> p br Emil mnn Rad..0 ux. un Q ¢w
<br /> Riot
<br /> upper .j.darcn.,.m�.n°c'orb.o3 Z
<br /> 1 r .bmma„v..c.�xsec'can.mr,.iw,.,i,,,vn,•,�3ws?o-s?an.am,aa.o., 2018 WSEC.0 DUCTINSULATION SCHEDULE
<br /> mDm n.a °. .nm .k. i''o
<br /> An C,�r Guenl R.uala lx 1, o11,,I,a... .s.nin, eamrae C.m.FinaAm DUCT TYPE INSULATION TYPE MIN.R-VALUE
<br /> r°.. New 11•11•Img holm C.d.floor Aia � NLLO
<br /> G.ernr lne 3.p.. Monona Ma nit kal y Si„&Zone, vn fluor, G..ae �a SUPPLY BRENRN AIR DUCTS IN UNCONDITIONED SPACE MINERAL-WOOL BLANKET 6.0
<br /> enpm.n «pas..Noll,1.l.taa:N ,
<br /> NNnaanal prop..Ilneelpua sox u+NR.0 009. o ,pPaeray:NOIS it eu FAN 1.01MN00FN L - tT..a-AL t00 3. nINSTALLATIONMNIIN SUPPLY ERE7l1RN AIRDl1CT5 LOCATED OUTSIDE THE BUILDING MINERAL-WOOL BLANKET 8.0 w
<br /> r3NtMLa,ERV,A I M \1
<br /> ^` ' N.nwnr arose Mmisf 00 n.tm. rknnE p E9A99 Eft., SUPPLYB RETURN AIR DUCTS LOCATED IN BUILDING ENVELOPE ASSEMBLY MINERAL-WOOL BLANKET 16.0
<br /> cm,Mp0 n T)p. AVp ke)l Pn.WM. im kep tlplmengnhd• \
<br /> arra.,N sink yen.ey.ems \ comm. SUPPLY WITH AIR TEMP<55°FOR>1D5°F WITHIN CONDITIONED SPACE MINERAL-WOOL BLANKET 3,3
<br /> Amrwm ivnn. In , .n
<br /> 041klossl el00En SUPPLY WTTH AIR TEMP<55°FOR>105°F WITHIN CONDITIONED SPACE DIRECTLY SERVED BY DUCT MINERAL-WOOL BLANKET 0.0
<br /> Dan
<br /> Dale ae m tw mpg. Deeseleee oecupa, eeallam mpg.. , o.rokfl lack a 0nb.nop.'? Ye,
<br /> Bawd66 ay.am.e.,pe,m nix revie.em m+y' Nn lerR•seraaempy In Appe.al.0mw .n Ile are,ernee ee.pn b or for u neepma 16 a„ SUPPLY DUCTS EXPOSED WITHIN CONDTIONED SPACE MINERAL-WOOL BLANKET 0.5
<br /> N
<br /> RETURN 8 EXHAUST WITHIN CONDITIONED SPACE.DOWNSTREAM OF AN ENERGY RECOVERY MEDIA AND UPSTREAM OF w h fro
<br /> Sxyei S(tRaCWMrIRG ALTERA7IGLE ZONE SYSTENS6 EQUIPMENT Compliance Verification COMPLIES RETURN
<br /> SHUTOFF DAMPER MINERAL-WOOL BLANKET 8.0 U
<br /> 1+melez..e AI,ti,lmotes -Nmr..oux.n.rbr...amxv I _ a wAit Solvm a....r1ommatk. RELIEF B EXHAUST WITHIN CONDITIONED SPACE,DOWNSTREAM OF AUTOMATIC SHUTOFF DAMPER MINERAL-WOOL BLANKET 16.0LLoo;4., �Fa•p l0 wiaury aamn�'I.L. \nllmt \'n1m1m "M Y.M.nnnO.w +en19..mo ex _ e Reme,y(Tmal nlamelpk lmnal rKM.,rA) OOgifSupN,.dww :31 .gan\ie DONS R\'-I Tnp.440.xx�Remyey OUTSIDE AIR INSIDE CONDITIONED SPACE.UPSTREAM OF AUTOMATIC SHUTOFF DAMPER AND GREATER THAN 2,800 CFM MINERAL-WOOL BLANKET 16.0diu
<br /> ICI-i UI i amy,d'Am _ Ohl NmmW„m a- Soon.1,00 1'NV�I n .1n=.�nlno ennm ,7 �2
<br /> z
<br /> ai4.u..4 EOH .e-Celia me a, m +**c .R OUTSIDE AIR INSIDE CONDITIONED SPACE.DOWNSTREAM OF AUTOMATIC SHUTOFF DAMPER AND GREATER THAN 2,600 MINERAL-WOOL BLANKET 8.0 Q ^� U
<br /> CMm4 SyNmE4mpnr apemle Tyr C�C� .arfEmlm.O rem E.0rba m-. .Emea«. Pgwdt'-" CC P.om.e00* ""t3k.m"- I(
<br /> Fy.p II M.Mper N.nplkrlric ru Nw4ue..xEC4 Eram1 Emep.,T um CFM CO Z
<br /> L-�nr: 1�0*010 d apt n..,n 1 3 uul -
<br /> HLrr11,1 .aieooke ,plit,am a_u 1 1u 1 10 SEER 1r.R COMM, OUTSIDE AIR INSIDE CONDITIONED SPACE AND LESS THAN 2,BW CFM MINERAL-WOOL BLANKET 7.0 O
<br /> c Eepiper 1.Head, m LJ_ U
<br /> Ao- I ,Mien!la.,roan I EllirycmpR..ee OUTSIDE AIR DUCT IN UNHEATED EQUIPMENT ROOMS WITH COMBUSTION AIR LOWERS.ISOLATED FROM CONDITIONED - Z
<br /> u C....EC .."...)'\E MINERAL-WOOL BLANKET D,0 U)z.,.n.TnW Ttn Rerearr'�r n coat Cohort.IRr.M era r,
<br /> IU .N hta l,.I�l'm loin VeMnem U
<br /> ,Faale n' L° SPACE AT SIDES,TOP AND BOTTOM WITH R-17 INSULATION
<br /> „• w w w usrt p a. c0r COMM.
<br /> II X
<br /> III:111,1 rle,o, 000k m5 bplayna r13+ a0..
<br /> 1 coCnrin u n ,.=n.,,a,min9 co,,,,,,,.. ro.3w w-.np • I nary' col +oau.u.a W
<br /> FY W
<br /> '�11.p."'Lon° NOTES:(1) DUCT INSULATION SHALL COMPLY WITH IMC ANDWSEC. z>- O Z
<br /> m,Fq.1p 1111 Sn.IN Served I Ix.rme 1.hmpn N.mN-rWDeetl11 I QN
<br /> (2) VAPOR RETARDER IS INSTALLED ON SUPPLY AND OUTSIDE AIR DUCT PER IMC604.1 i. Q<5 U
<br /> - -- (3) EXTERNAL DUCT INSULATION IS IDENTIFIABLE PER AMC 604.7. ~ ¢ Z
<br /> Z.R W
<br /> (4) ALL DUCTWORK IS CONSTRUCTED AND SEALED PER IMC. DCk
<br /> Ill-r _ Pill.. E f ALL O m K
<br /> •Sparn'1 qtr.l0 I.•Ofgle.meprrw-6gp`a® (5) INSULATION SMALL HAVE A MAXIMUM FLAME SPREAD INDEX OF 25 AND A MAXIMUM SMOKE DEVELOPED INDEX OF 50 PER IMC 604.3. 2�j
<br /> S0.i,pS.ay...Aa:bry Maas Type 9p I.10aau1v owl Emee®09110i s MNne:Arlyin010€w.onum.N"M.n_ _ �w
<br /> - nr,919 im.0',,V1.IIUAa ryi,A.hl u,l^ii.>aem 1. eWm ..,b,°,mh M5rL 44 Flhimve RU Wit.C,dmW Tank(=n?.3_`�_,.I.,,:i.n an,l,prlwd,mn run..,.
<br /> Rorie Co,OSA TO.ER.ear: ml Lm La0:11'
<br /> U
<br /> W..a-rym E.m p amlm Rrem m C e .arli,li,11.1 .1a33.u=1.Im1aa3 and AspRmee N Poe, ILIFCI:•I,Im-r MUMMA ZONE I AL O
<br /> ya.mt.,pip lU.3Ainpt,.mwple ilem,SinS/nm PIPE MATERIALS SCHEDULE u
<br /> Om:Ksmx.A.o,I,fy Heating ryye:li,e,.mmmrrela not) uax'mpliox0 Wd:A511inyma ws tamminr<.apim PIPE TYPE MATERIAL JOINT INSULATION
<br /> Ai k1caura cso,eon app!:L.p I•IOMpim]with 1Jm99*,Note Hap loam On1.aal WOVE Eymprma:.ny Rannm3N4-Cm4i,F Tabk C.03.'.T_1•Unitary and',plod 11o1 P,mp
<br /> Proposed L•.a0ATemp E1Li=ny: Lm Lu,Cem REFRIGERANT LIQUID 8 VAPOR ACR COPPER BRAZED 1'EPDM RATED FOR 250°F(1)(2) DATE:
<br /> 9(11'twor cmocml Reran“Tdes-rlsai,g:Mrk 0032(21•Uzi,W Apprid 1m.00l9 04/25/2023
<br /> CONDENSATE DRAINAGE COPPER,TYPE L SOLDERED NONE
<br /> NOTES:(1) PIPING INSULATION ON THE ROOF OR OTHERWISE EXPOSED SHALL BE OUTDOOR AND W RATED. SHEET TITLE:
<br /> PROPOSED EQUIPMENT IS RATED (2) ASTM E 84 PLENUM RATED. SCHEDULES
<br /> UNDER HSPF2 FOR 2021 WSEC.C.
<br /> ACTUAL EQUIPMENT HSPF2 RATING
<br /> IS 7.5 TO COMPLY WITH NEW TABLE
<br /> WSEC-C COMPLIANCE FORMS C403.3.2(1)REQUIREMENTS. 1
<br /> SCALE:NONE MODS
<br /> SHEET NO.
<br /> M001
<br />
|