Laserfiche WebLink
3 5 B w <br /> CORNER BARS TO MATCH EXT. Z o <br /> AOD'L HORIZ. REINF. AS SHOWN Z O <br /> VERTS. w F_ <br /> 24" g -_ - - --_-==� — a N <br /> TYPICAL CORNER BARS - M z <br /> s- LLJ <br /> Q ¢rn <br /> 24" J __..,..-- SECTION VIEWch <br /> --- - - -------------------------------- - - z 'a <br /> O I c co <br /> -- <br /> DOUBLE CURTAIN 4 10 PROVIDE POST PER PLAN i r7 U <br /> N <br /> f EACH END OF BEAM. WRAP �2 wLLJ <br /> k/i CS20 STRAP OVER BEAM AND <br /> UP OPPOSITE FACE <br /> 2 I I <br /> CORNER BARS TO MATCH 1 <br /> ADD'L HORIZONTAL REINFORCING <br /> VERTS, (ALTERNATE HOOKS) <br /> 24" <br /> TYPICAL CORNER BARS <br /> E <br /> 24" <br /> 9 <br /> SINGLE CURTAIN .I END LENGT I END LENGT <br /> IINI I III III 7 Ill INI �� I{MINI INI Ill INII <br /> TYPICAL CORNER REINFORCING DETAILS AT CONCRETE WALLS-0 II :;I <br /> NTS11 i - ....._� <br /> PROVIDE 1%" MIN. END <br /> yy F ^ I I I DISTANCE FOR NAILS <br /> If 4 L a <br /> PROVIDE 1%" MIN. END <br /> DISTANCE FOR NAILS <br /> �.' ( PROVIDE CS20 <br /> END LENGTH <br /> F ( STRAP. WRAP <br /> 1. HOLDOWN PER PLAN W/SCREWS PER MFR.SPECS, (OR NAILS SIMILAR). k i UNDER BEAM <br /> AND <br /> U FACE (f <br /> 2. EDGE NAILING TO POSTS, TRIM STUDS, AND KING STUDS. OF BEAM. <br /> POST TO BEAM <br /> 3. EDGE NAILING TO HOLD-DOWN POST (FULL HEIGHT) STAGGER INTO DOUBLES. I CONNECTION IPER PLAN <br /> 4. SHEARWALL EDGE NAILING AT ALL PANEL EDGES. BLOCKING AT ALL PANEL EDGES WHERE UPPER FLOOR BEAM STRAP CONNECTIONS Q <br /> APPLICABLE. - 3 W <br /> S. DOUBLE TOP PLATE WITH EDGE NAILING (STAGGER). NTS <br /> 6. STUDS AT 16"oc. <br /> I <br /> 7. PRESSURE TREATED SILL PLATE WITH EDGE NAILING AND ANCHOR BOLTS PER SHEARWALL <br /> SCHEDULE. <br /> B. TOP PLATE SPLICE NAILING TO BE (8) 16d SINKERS (MIN). LAP 48" MINIMUM. CENTER <br /> SPLICE ON STUD. <br /> 9. COORDINATE ALL STUD AND PLATE SIZES WITH SHEARWALL SCHEDULE REQUIREMENTS. <br /> 10. BEARING STUD FOR HEADER. <br /> 11. RIM JOIST TO BE ikz" MINIMUM THICKNESS AT ALL SHEARWALLS, <br /> STANDARD SHEARWALL ELEVATION WITH RIM <br /> NTS <br /> 19 of 19 <br />